Summary of Contents for Kanga Products LNR Precision EndFedz MTR-5
Page 1
The MTR-5 Five Band Mountain Topper KD1JV Designs Specifications Switch Selected 40M, 30M, 20M, 17M, 15M Bands Features: Switch selected 40/30/20/17/15 m bands (no band modules to lose or change out) Wide operating voltage range, 6 to 12 volts 15 ma Rx current at 12V supply ...
Page 2
Construction – MTR-5B Firstly ensure that you take the proper anti-static precaution (ESD), also that you are working in a clean environment. Check that you have all the parts shown in the Picture (Fig 1.) Now take the 4 coloured wires, and separate them into White &...
Page 3
The PCB is Static sensitive, so please ensure you have taken the correct precautions and have ensured you have touched a grounded piece of equipment, or attach an ESD strap to yourself that is attached to ground. Take the 4 wires that you have prepared and solder them into the positions marked on the PCB, taking care not to use too much heat as you will damage the PCB,...
Page 4
Pick up the rear halve of the case and fit the BNC Socket and the power socket. The BNC will only fit one way, the Power Socket needs to be positioned as the picture here. Now tin with solder the connections, again being careful when applying heat as you can easily damage them.