BEFORE INSTALLING 6. Matrix Mirrors is not responsible for damage or injury in- curred during the installation process or for problems that arise The hanging orientation of the mirror should have been if its products should be installed by an unlicensed person.
The brackets must be installed on studs or blocking. Sheetrock alone is insufficient. 4. MOUNT CHASSIS Hang the mirror frame on the wall brackets by lifting up the top side of the frame above the brackets and sliding down. L2R Mirror with Heating Pad www.matrixmirrors.com/led-mirrors Installation Manual...
7. CONNECT LOW VOLTAGE Connect low voltage wires from the frame to the corresponding lead coming from the glass. Ensure the connection is made before mounting the glass. L2R Mirror with Heating Pad www.matrixmirrors.com/led-mirrors Installation Manual...
Page 5
Connect low voltage wires from the frame to the corresponding lead coming from the glass. Then attach glass by holding the glass slightly above the mounting frame, then slide down and to the left. Bracket Positions L2R Mirror with Heating Pad www.matrixmirrors.com/led-mirrors Installation Manual...
Page 6
THE CORRECT WIRING CONFGURATION AND INPUT VOLTAGE. DIRECT & INDIRECT MIRRORS MAY HAVE TWO SETS OF WIRING - WIRE TOGETHER OR ON SEPARATE CHANNELS. *Diagrams used for reference only. Wire positioning may vary. L2R Mirror with Heating Pad www.matrixmirrors.com/led-mirrors Installation Manual...
Page 7
L2R Mirror with Heating Pad www.matrixmirrors.com/led-mirrors Installation Manual...
Page 8
5965 Peachtree Corners East, Suite A-1. Norcross, GA 30071 www.matrixmirrors.com/led-mirrors (678) 580-5717...
Need help?
Do you have a question about the L2R and is the answer not in the manual?
Questions and answers