Download Print this page
Dakin RXM85PVMA Service Manual

Dakin RXM85PVMA Service Manual

Removal procedure

Advertisement

Si001423E
REMOVAL
PROCEDURE
S E R V I C E
M A N U A L
8.5/9.5 kW Class
Outdoor Unit
Inverter
Pair Type

Advertisement

loading

Summary of Contents for Dakin RXM85PVMA

  • Page 1 Si001423E REMOVAL PROCEDURE S E R V I C E M A N U A L 8.5/9.5 kW Class Outdoor Unit Inverter Pair Type...
  • Page 2 Service Manual Removal Procedure Outdoor Unit Heat Pump RXM85PVMA RXM95PVMA...
  • Page 3: Table Of Contents

    Si001423E Table of Contents 1. Outer Panels ...................2 2. Fan Motor....................7 3. Electrical Box ..................8 4. PCBs .....................10 5. Coils / Thermistor ASSY ...............14 6. Sound Blankets ..................17 7. Compressor...................18 Note: The illustrations may be slightly different depending on the model. Removal Procedure...
  • Page 4: Outer Panels

    Outer Panels Si001423E 1. Outer Panels Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points 1. Remove the suction grille. Hook Pull out the bottom of the suction grille. Unfasten the 3 hooks Suction grille on the top of the suction...
  • Page 5 Si001423E Outer Panels Step Procedure Points Remove the 5 screws. Right side Slide the right side panel panel downward to unfasten the 2 hooks on the back. (R21745) Remove the right side panel. (R21746) Remove the screw. Slide the front panel (2) downward.
  • Page 6 Outer Panels Si001423E Step Procedure Points Remove the 4 screws. Pull out the bottom of the discharge grille and remove it. Discharge grille (R21749) The discharge grille has 4 hooks on the back. When reassembling, make sure to fit the 4 hooks. (R21750) Remove the nut and Nut size: M8...
  • Page 7 Si001423E Outer Panels Step Procedure Points Lift up the front panel (1) to unfasten the hook. Remove the front panel (1). (R21754) Remove the 2 screws Partition plate (2) has a hook on the partition plate on the right. (2). Lift up the partition plate (2) and remove it.
  • Page 8 Outer Panels Si001423E Step Procedure Points Remove the 4 screws The 85 class model has 2 of the rear panel. more screws on the back. Lift the rear panel upward to unfasten the 2 hooks. Rear panel (R21759) Remove the rear panel. Hook (R21760) Push the hooks of the...
  • Page 9: Fan Motor

    Si001423E Fan Motor 2. Fan Motor Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points Disconnect the [S70]: fan motor [S70] connector [S70] and pull out the clamp. When reassembling, insert the clamp into the hole.
  • Page 10: Electrical Box

    Electrical Box Si001423E 3. Electrical Box Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points Remove the 2 screws and release the earth / ground wires. Earth / ground wire (R21764) Pull out the 2 clamps [S20]: electronic expansion...
  • Page 11 Si001423E Electrical Box Step Procedure Points Pull out the clamp and disconnect the relay connector for compressor. Disconnect the relay connector for overload Clamp protector. Relay connector for compressor Relay connector for overload protector (R21768) Remove the 2 screws. (R21769) Slide the electrical box to the left to unfasten the hook.
  • Page 12: Pcbs

    PCBs Si001423E 4. PCBs Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points 1. Remove the main PCB. Electrical Unfasten the 4 hooks box cover and remove the electrical box cover.
  • Page 13 Si001423E PCBs Procedure Points Step Remove the screw of Terminal board cover the terminal board cover. Remove the earth / ground screw. Earth / Remove the screw and ground wire remove the terminal board for the smart meter. Terminal board for smart meter (R21774) Unfasten the hook on...
  • Page 14 PCBs Si001423E Procedure Points Step Disconnect the [HR1]: reactor (white) connectors [HR1], [HR2]: reactor (blue) [HR1] [HR2]. The harness for [HR2] has a ferrite core. [HR2] Ferrite core (R21778) Remove the 3 screws Hook and unfasten the 4 hooks. Hook Main PCB (R21779) Lift up and remove the...
  • Page 15 Si001423E PCBs Procedure Points Step 3. Remove the demand control PCB. Remove the 2 screws. (R21782) Lift up and remove the Demand demand control unit. control unit (R21783) Unfasten the 2 hooks Cover and open the cover. Disconnect the [S206]: terminal board for smart connector [S206].
  • Page 16: Coils / Thermistor Assy

    Coils / Thermistor ASSY Si001423E 5. Coils / Thermistor ASSY Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points 1. Remove the electronic Clamp expansion valve coil. Pull out the clamp from the hook and release the harness for...
  • Page 17 Si001423E Coils / Thermistor ASSY Step Procedure Points Open the outdoor When reassembling, pass temperature thermistor the outdoor temperature holder. thermistor through the heat exchanger tube U-bend and the hole as below. Outdoor temperature thermistor U-bend holder Hole (R21820) (R21789) Release the outdoor temperature thermistor.
  • Page 18 Coils / Thermistor ASSY Si001423E Step Procedure Points Slightly open the sound Sound blanket blanket (outer) and (top) sound blanket (top). Sound blanket (outer) (R21791) Detach the discharge pipe thermistor. Discharge pipe thermistor (R9635) Pull out the thermistor ASSY. (R21792) 3.
  • Page 19: Sound Blankets

    Si001423E Sound Blankets 6. Sound Blankets Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Step Procedure Points Remove the sound blanket (top). Sound blanket (top) (R21793) Pull out and remove the sound blanket (outer).
  • Page 20: Compressor

    Compressor Si001423E 7. Compressor Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Be careful not to get yourself burnt with the pipes and other parts that are heated by the gas brazing machine.
  • Page 21 Si001423E Compressor Step Procedure Points Disconnect the lead Overload wires of the compressor protector and overload protector. V (yellow) U (red) W (blue) (R21797) Remove the protection Clamp bushing. Pull out the clamp and remove the compressor lead wire. Compressor lead wire Protection bushing...
  • Page 22 Revision History Month / Year Version Revised contents 03 / 2015 Si001423E First edition...
  • Page 23 Daikin products are manufactured for export to numerous countries throughout the world. Prior to Warning purchase, please confirm with your local authorised importer, distributor and/or retailer whether this product conforms to the applicable standards, and is suitable for use, in the region where the product will be used.

This manual is also suitable for:

Rxm95pvma