Download Print this page

Nixie UNIVERSAL TUBE CLOCK KIT Assembly Instructions And User's Manual page 20

Advertisement

4.4. Test low voltage (LV) source operability. Touch the black probe on the GND test point and the red
probe on the 5V test point. The voltage should measure between 4.8 and 5.2 Volts. If not, disconnect
power and check all relevant joints quality and polarity.
Do not continue with the assembly until the error will be corrected.
4.5. Once the last test of LV source is completed, disconnect the power.
U4
Atmega328P-PU
R11
10kΩ
U4 Socket
28 pin socket
5.1. Take the resistor R11 and bend it, like pointed in item 3.1. Insert resistor into the board holes
marked as R11 and solder it leads.
5.2. Insert U4 socket and solder it leads.
nixiediy@gmail.com
5. Microcontroller circuit components assembly
20

Advertisement

loading

Related Products for Nixie UNIVERSAL TUBE CLOCK KIT

This manual is also suitable for:

In-12