i-KI Commissioning with Nadi Controller
This document must be read in association with the i-KI installation manual provided with the
unit. The purpose of this document is to assist with the commissioning of the heat pump. It is
essential the manual is read and followed to ensure the installation is per manufacturers
criteria.
There are various systems/set ups the Heat Pump can be installed to. This document will
covers the most common options:
Pre-Commissioning
B. Underfloor with Aube Thermostat
C. Underfloor with Aube Thermostat and DHW
D. Underfloor with Buffer Tank, Aube Thermostat and DHW
E. Underfloor with Nadi Controller
Final Notes – Complete commissioning, checking
Temperatures, Troubleshooting
1.
Prior to Commissioning
A) Ensure the heat pump is installed in accordance with the installation manual.
B) Ensure the power is isolated to the unit
C) Remove the side cover of the unit to expose the water pump, compressor and electrical
enclosure.
D) Check that the water pump on the unit is free to turn and not seized. In addition please
check any internal pumps.
E) Fill the system with water and ensure all air is removed.
2.
Fill the system with water
The system can now be filled with
water to around 1 bar pressure.
The iKi heat pumps have a pump
run switch on the small PCB
under the front cover of the heat
pump on the smaller heat pumps,
and under a panel on the side of
the larger models. This allows
the circulation pump to be run
manually to help vent the system.
Leave the unit on standby for 2 hours once filled.
Before the heat pump runs for the first time it is necessary to let it stand for 2 hours
with the power on. This is to allow the heating band around the compressor to heat
the compressor to drive off any liquid refrigerant in the compressor. This is
rev001
Page 1
Page 6
Page 8
Page 12
Page 14
Page 16
pg. 1

Advertisement

loading

Summary of Contents for CENTRAL HEATING i-KI

  • Page 1 Commissioning with Nadi Controller This document must be read in association with the i-KI installation manual provided with the unit. The purpose of this document is to assist with the commissioning of the heat pump. It is essential the manual is read and followed to ensure the installation is per manufacturers criteria.
  • Page 2 necessary as the compressor is only designed to compress gas and if any liquid refrigerant is in the compressor when it starts it could be damaged. In the interim steps 3 and 4, setting the clock, can be completed. What happens when you turn on the main isolator The Nadi controller room unit will go through an initialisation phase that can last a few minutes and will show Cn followed by init before showing Off with the time.
  • Page 3 Switching on the controller ON (controller only. This does no switch the heat pump on) Accessing the Menu/Parameters within the Nadi Controller. To access the menu within the Nadi Controller press and hold the for 3 secs. (if the sun symbol on the top left hand corner appears, press the mode button to turn it off –...
  • Page 4 Turn the knob until you reach the required parameter. Once you see the required parameter on the screen press the knob to confirm. Turn the knob to adjust the setting. Press the knob to confirm the adjusted setting. Menu Settings The table below shows the various menus for accessing parameters and the associated passwords to gain access to the relevant locations.
  • Page 5 It is recommended that a flow switch is installed. Should you not install a flow switch then it is necessary to install a bridge between terminals 39 and 40. i-KI Internal Module Final Wiring layout – Underfloor Layout with Aube Thermostat pg. 5...
  • Page 6 A2. Parameter Settings Aube Thermostat Control - Ensure the Nadi controller is disabled as a room stat and the Aube Thermostat is activated. Parameter 11D is factory set to 1. Check to ensure this parameter is set to 1. Menu 1, and turn the knob anti-clockwise until 11D displays on the screen. If set to 0, change to 1.
  • Page 7 A4. Testing the Heating First start the heat pump in heating mode only to check heating. Using the mode button on the top left of the Nadi room controller press until the sun symbol shows. Ensure Heat is going to the area/zone. A5.
  • Page 8 It is recommended that a flow switch is installed. Should you not install a flow switch then it is necessary to install a bridge between terminals 39 and 40. i-KI Internal Module Final Wiring layout – Underfloor Layout with Aube Thermostat and B2. Parameter Settings Aube Thermostat Control - Ensure the Nadi controller is disabled as a room stat and the Aube Thermostat is activated.
  • Page 9 Return Set Point  Menu 1, parameter 0152 – ensure this is set at 0.  Menu 1, parameter 0153 – adjust the set point as required (typically 45 for underfloor heating). Weather Compensation  Menu 1, parameter 0152 – change to 1. ...
  • Page 10 B6. Test the DHW To test the DHW, switch on the DHW on the Nadi controller, the symbol should appear. The 3-way valve should turn to the “open” position. Notch position when being installed: A to left Valve actuator points to OPEN position and AB to right.
  • Page 11 It is recommended that a flow switch is installed. Should you not install a flow switch then it is necessary to install a bridge between terminals 39 and 40. i-KI Internal Module Final Wiring layout – Underfloor Layout with Buffer Tank, Aube Thermostat and DHW C2.
  • Page 12 Aube Thermostat Control - Ensure the Nadi controller is disabled as a room stat and the Aube Thermostat is activated. Parameter 11D is factory set to 0. Change this from 0 to 1 to achieve control of the Aube Stat. Menu 1, and turn the knob anti-clockwise until 11D displays on the screen.
  • Page 13 C5. Testing the Heating First start the heat pump in heating mode only to check heating. Using the mode button on the top left of the Nadi room controller press until the sun symbol shows. C6. Test the DHW To test the DHW, switch on the DHW on the Nadi controller, the symbol should appear.
  • Page 14 Underfloor controlled with Nadi Controller (Or Radiators) Central Heating New Zealand recommend a Aube Thermostat is used to control underfloor heating. Should the Nadi Controller be used to control the underfloor then the following steps highlight the various parameters that need to be adjusted and checked.
  • Page 15 D4. Testing the Heating First start the heat pump in heating mode only to check heating. Using the mode button on the top left of the Nadi room controller press until the sun symbol shows. Ensure Heat is going to the area/zone. D5.
  • Page 16 Final Notes Complete commissioning Add Fernox to the system and top up the pressure to 2 bar. Clean the filter on the heat pump to remove any debris flushed through during commissioning. Leave the heating on to demonstrate that it works. How to check sensor temperatures Go to menu 09 following instructions above which shows what the temperature sensors are reading...