Page 1
QJY-S3 Scissor vehicle lift Original Operation Manual IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO INSTALLATION AND OPERATION. BY PROCEEDING WITH LIFT INSTALLATION AND OPERATION YOU AGREE THAT YOU FULLY UNDERSTAND AND COMPREHEND THE FULL CONTENTS OF THIS MANUAL.
Chapter 1 Packing, transport and storage ALL PACKING, LIFTING, HANDLING, TRANSPORT AND UNPACKING ORERATIONS ARE TO BE PERFORMED EXCLUSIVELY BY EXPERT PERSONNEL WITH KNOWLEDGE OF THE LIFT AND THE CONTENTS OF THIS MANUL. 1.1Package The dimension of package, please see below, and the package weight is 939.8Lbs, 9"...
1.4 Opening When the crates arrive, check that the machine has not been damaged during transport and that all parts listed are present. The crates must be opened using all possible precau�onary measure to avoid damaging the machine or its parts. Make sure that parts do not fall from the crate during opening.
Be sure the motor of the vehicle is off, the gear engaged and the parking brake put Be sure only authorized vehicles are lifted without exceeding the maximum lifting capacity; Verify that no one is on the arms during lifting or standing. 3.2 Safety device To avoid overloading and possible breaking, the following safety devices have been used: A maximum pressure valve is placed inside the hydraulic unit to prevent excessive...
Page 9
Cause by operations involving the application of force sufficient to displace the vehicle. In the case of large or particular heavy vehicles, sudden movement could create an unacceptable overload or uneven load sharing. Therefore, before lifting the vehicle and during all operations on the vehicle, make sure that it is properly topped by the hand brake.
have no load. It is therefore essential to adhere scrupulously to all regulations regarding use, maintenance and safety contained in this manual. 3.4 Warning labels All safety warning signs displayed on the machine are with the purpose to draw the operator’s attention to dangerous or unsafe situations.
resulting from improper installation or use of this product. Please read entire manual prior to installation 4.2 Selec�ng site Before installing your new lift, check the following. 1. LIFT LOCATION: Always use architectural plans when available. Check the layout dimension against the floor plan requirements making sure that adequate space is available.
Chapter 5 Adjustment 5.1Start Make sure all pins and bolts to insure proper moun�ng Make sure the electrical system feeding voltage is equal to that specified in the nameplate on the motor Make sure the electric connec�ons are in compliant with the electrical diagram. ...
Chapter 6 Opera�on instruc�on Lift operation by authorized personnel over 18 years only. Apply the parking brake after positioning the vehicle on the lift. Do not allow anyone to stay in lift area during raising and lowering cycles. Closely watch the vehicle and the lift during raising and lowering cycles. Observe the rated load capacity and load distribution.
6.3 To lower the li� Be sure the safety area is free of people and objects; Raise the lift a little bit by pushing UP button to clear off the safety; Press unloading handle on the power unit to lower the lift. ...
Check oil for contamination or ageing. Contaminated oil is Every 6 months Oil the main reason for failure of valves and shorter life of gears pumps General check Verify that all components and mechanisms are not damaged Every 12 months A check of the electrical system to verify that motor must be Electrical system...
button, the machine is not The air pressure is not enough, the safety lowered pawl is stuck or the air pipe is broken off, The safety pawl is not adjust pressure, check the air pipe and lifted. replace it. Check the plug and coil of the lowering The lowering solenoid valve is solenoid valve and check the right turn energized but does not work...
country in which the rack is installed. Finally, it should be recalled that for tax purposes, demoli�on must be documented; submi�ng claims and documents according to the current laws in the country in which the rack is installed at the �me the machine is demolished.
Page 20
Part # are available for purchase. For assistance with the operation or the availability of replacement parts, contact our Parts and Warranty Department at 1-888-44-TORIN (1-888-448-6746). Please have available a copy of your receipt, the model number of the product, serial number, and specific details regarding your question.
Page 21
Manufacturer reserves the rights to make design changes and or improvements to this product line and manual without notice. We at Torin have taken every effort to ensure complete and accurate instructions have been included in this manual. However, possible product updates, revisions and or changes may have occurred since this printing.
Page 22
TORIN INC. INSTALLATION AGREEMENT TORIN Pre-Installation Agreement I, (the undersigned) acting as the installer listed assume responsibility for any permits required city, state or county mandated, related to the installation and/or operation of this equipment. assume responsibility for the concrete floor and condition...
Page 23
TORIN INC. INSTALLATION AGREEMENT Email Signed Installation Agreement to info@torin-usa.com Mail Signed Installation Agreement to TORIN INC. 4355 E. Brickell St. Ontario, CA 91761 USA Pre-Installation Agreement Signatures Required: Customer Name: Date of Installation: Company Name (if applicable): Street Address:...
Page 24
1-888-44-TORIN (1-888-448-6746) 8:00am – 5:00pm Pacific Time, Monday – Friday Comuníquese conel Servicio de Atención al Cliente de Torin® directamente por teléfono al: 1-888-44-TORIN (1-888-448-6746) De lunes a viernes de 8:00 a. m. a 5 p. m. hora del Pacífico Communiquez directement avec le Service à...
Need help?
Do you have a question about the QJY-S3 and is the answer not in the manual?
Questions and answers