Contact Talent-MG2 Monitoring System Packing List Installation Technical Data Installation Wi-Fi Configuration (Only Talent-MG2-WP) LED Description Website Configuration Step 1: Install the microinverter and the monitoring device Step 2: Establish an account Step 3: Networking for the monitoring system Step 4: Create a Plant...
TSUNESS service representative. Contact If you have technical problems about our products, contact the TSUN Service line. TSUNESS Co., Ltd el: +86-573-8466 8569 E-mail: sales@tsun-ess.com | www.tsun-ess.com Add: Building E1, No.
2.4G RF wireless to collect the data and status of the microinverters in the system. At the same time, Monitor Device connects to the Internet through WIFI (Talent-MG2-WP) or GPRS (Talent-MG2-GP), which realizes the information exchange with the monitoring service and sends all the running data of microinverters and status of the system to the monitoring server.
Talent-MG2-WP/GP Installation Description Description Object Object DRM Port (For Australia) Power LED Ethernet Port Communication LED (Server) USB Port Communication LED (Inverter) Reset Hole Alarm LED Power Port SD Card Slot Antenna (2.4G) SIM Card Slot Installation Hole Antenna (Wi-Fi/GPRS) RS485 Port * Only Talent-MG2-G has a SIM Card Slot.
Talent-MG2-WP/GP Technical Data Model Talent-MG2-WP Talent-MG2-GP Communication to Microinverter Signal 2.4G RF 100m Maximum Distance(Open Space) 99 panels Monitoring Data Limit Communication to Server Sample Rate Per 15 minutes Signal Wi-Fi (802.11b/g/n) GSM (850/900/1800/1900MHz) Communication to Meter Signal RS485 Maximum Distance (RS485 Cable)
Talent-MG2-WP/GP Installation 1.Take two antennas out from the box, screw the antenna into the Wi-Fi/GPRS port and 2.4G port. Note: While installing Talent-MG2-GP, there are a GSM antenna and a 2.4G antenna. Do not insert the antenna to the wrong port.
Page 8
Talent-MG2-WP/GP 4.Match the bracket’s upper buckle with monitor device. Then match the bracket’s lower buckle by gently press the lower side of the monitor device until hear the“Click”. Note: Make sure the antennas are vertical to the wall. 5.Power on the monitor device.
Talent-MG2-WP/GP Wi-Fi Configuration (Only Talent-MG2-WP) 1.Connect the wireless name of MG2-W via computer or mobile phone. 2.Open the browser and enter 10.10.100.254 to open the Wi-Fi configuration page. The username and password are ‘admin’ by default. 3.Click the Wi-Fi parameter menu on the left menu bar to enter the Wi-Fi parameter configuration.
Talent-MG2-WP/GP 6.Click Restart. LED Description Explanation LED Mark LED Color Monitor device power on or power off Network communication Microinverter communication Fault State Description Status Firmware upgrading All LEDs www.tsun-ess.com...
Step 1: Install the microinverter and the monitoring device 1.Install the microinverter system. Please read the Quick Installation Guide or the User Manual of microinverter on www.tsun-ess.com/downloads before installation. 2.Install the monitoring device. Connect the power adapter into the socket 3.Make sure the microinverter system and the monitoring device are working well.
Talent-MG2-WP/GP Click the “Register” button and register a new account. Step 3: Networking for the monitoring system 1.Login to the platform and find the “Network” page by Applications → Network. (Please make sure that the monitoring device has already connected to the server.)
Page 13
Talent-MG2-WP/GP 2.Click “+Select” to input the SN of monitoring device. www.tsun-ess.com...
Talent-MG2-WP/GP 4.Click “Network” to map the device relationship. The communication relationship will be updated in a few minutes. Step 4: Create a Plant 1.Find the “Plants” page by O&M → Plants. Click ‘Create a Plant’ to create a new plant.
Page 15
Talent-MG2-WP/GP 4.Click “Network” to map the device relationship. The communication relationship will be updated in a few minutes. 4.All the plants can be viewed and managed in “Plants” page. www.tsun-ess.com...
Talent-MG2-WP/GP Step 5: Edit the system layout 1.Find the “Layout” page by O&M → Plants → “plant name” → Layout. Click “Click here to edit system layout”. 2.Drag the components to the right side to finish the physical layout. www.tsun-ess.com...
(input port) in order to cease output active power or limit active power to a regulating level. This logic input can be RS485 port, Ethernet port, etc. Talent-MG2-WP/GP provide RTU Modbus protocol over RS485 port for this remote active power control. For more information, please refer to “Modbus implementation Technical Note”.
Talent-MG2-WP/GP Zero export control function To maintain the safety and quality level of the grid network, some countries’ local grid authorities limit the PV generated power exporting to the grid. Zero export function can meet this requirement and help users install a bigger PV system without violating export regulations.
Talent-MG2-WP/GP Three Phase 120V/208V: Mainly for commercial systems in North America and South America. The phase voltage may vary from 110V to 127V. The outputs of microinverters are connected between two live lines, L1~L2, L2~L3 or L3~L1. Step 3: Confirm the loads’ capacity for CT and Meter Make sure the CT/Meter range can cover the maximum loads power or PV system generating power.
Talent-MG2-WP/GP Step 4: Install the meter and CT CHINT DDSU666 Single Phase Meter (Direct connect) Port 1 input port, connect to the L line; Port 2 output port, connect to the L line; Port 3 connect to the N line;...
Page 21
Talent-MG2-WP/GP Port 1 input port, connect to the L line of phase A; Port 3 output port, connect to the L line of phase A; Port 4 input port, connect to the L line of phase B; Port 6 output port, connect to the L line of phase B;...
Talent-MG2-WP/GP Make sure the CT (Current Transformer) has been installed in the right direction, otherwise will affect the current readings and Meter function. Meter install on the Grid side, the CT arrow pointed to the Grid. Step 5: Connect the meter to the RS485 port of monitor device The picture below indicates the RS485 A Port and B Port on the monitor device.
Talent-MG2-WP/GP Step 6: Set zero export function on the monitor platform Login to the platform and find the “Zero-export Setting” page by Applications → Zero-ex- port Setting. (Please make sure that the monitoring device has already connected to the server.)
Need help?
Do you have a question about the Talent-MG2-WP and is the answer not in the manual?
Questions and answers