Building-In; Technical Specifications - Atag HG40 K/G Series Instructions For Use Manual

Table of Contents

Advertisement

Available languages

Available languages

Building-in

1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the back.
560
490
10
10 mm
fig. 3
Please note:
The area to be cut away at the front is
measured from 10 mm from the body of the
cupboard (cupboard front without door).
2. Make a hole in the side of the kitchen cabinet
to enable the gas pipe to be passed through.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
fig. 4
5. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
6. Put the plug in the socket
(see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a
built-in oven is described in the installation guide
for the oven.
Attention!
The underside of this built-in hob becomes
hot. Take care that you do not place any
flammable or plastic objects in any drawer
under the appliance.

Technical specifications

(also see table on cover)
Type of hob
HG40..G
Electric:
3-core connection lead
Connection AC 230 V - 50Hz - 0.6 VA
Spark switch integrated in
control buttons
Gas:
Connection G3/8"
Dimensions (appliance):
580x67x510 wxhxd in mm
580x45x510 bxhxd in mm
Dimensions (recess):
560x490 wxd in mm
HG40..K
HG60..G
HG60..K

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hg60 k/g series

Table of Contents