6.1 Combination pH (mV) electrodes
Connect the pH (mV) electrode cable to the pH/mV electrode BNC input
connector.
6.2 Separate pH (mV) electrodes
Connect the working electrode to the pH/mV electrode BNC input connector.
Connect the reference electrode to the Reference input terminal.
7.
Temperature compensation input connections
7.1 ATC mode
Connect the automatic temperature compensation, ATC, probe to the ATC input
terminals.
7.2 A percision 0.1% resistor can be connected across the ATC terminals to simulate
a fixed process temperature. (Refer to TABLE 1)

MOUNTING PROCEDURE

1.
Make a cutout on any panel, with a thickness of 1/16 in. (1.5 mm) to 3/8 in. (9.5 mm).
(Refer to FIGURE 4)
2.
Remove the mounting brackets assembly from the panel meter and insert the panel
meter into the cutout. (Refer to Figure 5)
3.
Replace the mounting brackets assembly onto the panel meter and fasten the
mounting screws to secure the panel meter to the mounting panel. (Refer to Figure 6)