Page 1
Heat Pump Kit 5/16” 61040 Manual for Operation OMNI Vacuum Gauge Operating Instructions: ™ 1. Press the ON/OFF button to power on the gauge. 2. To manually power off the gauge, press and hold the ON/OFF button until the screen displays the “YJ” logo.
Page 2
Single Valve Manifold Connection Guide Reading System Pressure 1. Ensure both the ball valve and manifold valve are in the closed position 2. Connect the 5/16” ball valve to the system 3. Open system valve 4. Open ball valve 5. Purge non-condensable gas from hose fitting at manifold fitting 6.
Page 3
Single Valve Manifold Connection Guide – continued Drawing Vacuum on the System 1. Connect core removal tool to system. 2. Use built in Schrader valve tool to remove core, set aside for re-use, or replace with fresh core once evacuation is complete.
Page 4
™ 61045 Custom Foam Carrying Case • One-year warranty • MADE IN USA Ritchie Engineering Company, Inc. YELLOW JACKET Products Division ® 10950 Hampshire Avenue South WARNING: This product can expose Bloomington, MN 55438-2623 USA you to lead, which is known to the...