Page 1
S E R I E S TANARIS RGB P R O F E S I O N A L G A M I N G D E S K U S E R M A N U A L...
Page 2
TANARIS RGB PRO Installation Tips Please don't tighten the screws completely and go back later for a final tightening of all the screws after pieces are aligned with each other. Lacy a mat or old blanket out to assemble onto so the floor and the funiture doesn't get...
Page 3
TANARIS RGB PRO Step1 Lift Column Base Leveling Studs M6x16 Screws Step2 Crossbar End Suit M6x12 Screws...
Page 4
TANARIS RGB PRO Step3 Crossbar End Suit M8x12 Screws M8 Nut Step4 Side Backet M6x8 Screws...
Page 5
TANARIS RGB PRO Step5 Control Box Adapter - Control box is equipped with gyro sensor so the table and control box must be leveled. - Please adhere control box into crossbar with glud pad in order to work properly or else it will not move up and down.
Page 7
TANARIS RGB PRO Ready to Use Before Plugging the table into the outlet, make sure that - The lift columns are level and set at the lowest position. - All the screws are tightened, to avoid the desk making noise and wobbling.
Page 8
M O R E I N F O R M A T I O N A T www.newskillgaming.com...
Need help?
Do you have a question about the TANARIS RGB PRO and is the answer not in the manual?
Questions and answers