Summary of Contents for Stoane Lighting STX2.50 Integral
Page 1
STX2.50 Integral.pdf 1 03/12/2020 09:37:59 STX2.50 Integral Installation and Maintenance Instructions IMPORTANT: All wiring connections must be made before switching on mains power. Class I - Fitting must be Earthed Xicato LED Module This product should not be disposed of in your general waste...
Page 2
STX2.50 Integral.pdf 2 03/12/2020 09:37:59 Electrical Supply Installation Installation must be carried out by a qualified electrician in Check that the mounting surface is suitable for the accordance with BS 7671:2008 Wiring Regulations. installation of this fitting. Fitting Weight : 0.6kg.
Page 3
STX2.50 Integral.pdf 3 03/12/2020 09:37:59 Connect Earth Additional connectors will be available for dimming connections (if specified). Suitable connectors are supplied for loop in/out of mains. Mains connections from PSU White = Neutral Black - Live...
Page 4
STX2.50 Integral.pdf 4 03/12/2020 09:37:59 MODULE AND ACCESSORIES ADJUSTMENT The fitting uses a Xicato XIM LED module. The colour To adjust the tilt and pan of the fitting use the supplied temperature and lumen output can be found on the 2.5mm Allen key to loosen off the tilt and pan lock screws.
Page 5
STX2.50 Integral.pdf 5 03/12/2020 09:37:59 COMPACT Splicing Connectors for All Conductor Types 221 Series – Description and Handling – Strip wire to 11 mm / 0.43 in. Termination: Open clamping unit using the lever and Then lower lever to close the clamp.
Need help?
Do you have a question about the STX2.50 Integral and is the answer not in the manual?
Questions and answers