Do you have a question about the WUF015 and is the answer not in the manual?
Questions and answers
Summary of Contents for Sutcliffe Play WUF015
Page 1
BARK PARK WUF015 Cat Walk Installation Instructions...
Page 2
WUF004 Crawl Through Installation Procedure Check using the Parts List that none of the components are missing. Plan the final position of the Cat Walk ensuring there is sufficient space.* Sort and identify parts before assembly. All four posts are identical. Excavate the foundation holes in accordance with the plan on pages 3 and 4.** Position 2 x 300 long spragging irons into the holes provided in each post and stand in the foundation holes.
Page 4
WUF015 Crawl Through Fixings and Foundation Plan DZS009 M10 STEP WASHER x8 DZS005 M10 BLACK NUT COVER HSS510 M10 x 30 HEX SCREW x4 LKN320 M10 LOCK NUT x4 MSL002 SPRAGGING IRON x4 FIX155 M10 x 30 SECURITY SCREW x8...
Page 5
WUF015 Cat Walk Maintenance Instructions Recommended Regular Inspection and Maintenance Interval Days Check stability of structure, tighten connections if required. Check all uprights at ground level for corrosion and/or rot. Replace any defective parts. Check all painted elements for damage, rub down and repaint or replace as required.
Need help?
Do you have a question about the WUF015 and is the answer not in the manual?
Questions and answers