RTI SiloKing 1500 Instructions And Operating Manual

RTI SiloKing 1500 Instructions And Operating Manual

Compressor installation powerband driven

Advertisement

Quick Links

INSTRUCTION AND
OPERATING MANUAL
Compressor installation SiloKing 1500
Powerband driven

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SiloKing 1500 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RTI SiloKing 1500

  • Page 1 INSTRUCTION AND OPERATING MANUAL Compressor installation SiloKing 1500 Powerband driven...
  • Page 2 Repairs, maintenance or conversion w ork shall only be carried out by authorised, trained and qualified personnel that are familiar w ith the current safety regulations. - page 2 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 3: Table Of Contents

    Mounting inst ructions RTI installation pow erband driven Mounting instructions high air intake Start-up Maintenance installation Inspection during operation Weekly inspection Monthly inspection Half-yearly inspection Maintenance checklist - page 3 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 4: General

    (0031) 544-376499 Email: info@rti.nl Service facilities For addresses of service/technical support facilities, please visit our w ebsite www.rti.nl Technical data compressors Image 1.3.1 - page 4 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 5: Oil Siloking Compressors

    Oil SiloKing - page 5 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 6: Oil Cooler

    Image 1.5.1 Oil cooler (art.no. 1342) Image 1.5.2 - page 6 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 7: Safety

    Modifications installation Without approval from RTI, it is not permitted to make any alterations to the installation. - page 7 of 15 – Instruction and operat ing manual CVS SiloKing 1500...
  • Page 8: Mounting Installation

    The vacuum valve has not been set w hen the installation is delivered as a building kit (w ithout mounting by RTI). - page 8 of 15 –...
  • Page 9: Mounting Instructions High Air Intake

    The sliding joint should separate from the high air intake before the drivers cab is tilted. Check the negative pressure after mounting (this should not be below 45 mbar). Image 3.2.1 - page 9 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 10: Start-Up

    The rotors of the compressor are sprayed w ith an anti-corrosion agent prior to delivery. During the initial operation this agent w ill evaporate as the compressor heats up. Since the RTI-installations are all tested a few minutes, the anti-corrosion agent on the rotors w ill have evaporated.
  • Page 11: Maintenance Installation

    (blow -off pressure 2.5 bar) Pay attention to any unusual sounds or peculiarities near the installation. - page 11 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 12: Weekly Inspection

    Check the tension of the V-belt/pow erband and asses the w ear of the belt. Retighten the belt if your can press over 0.5 centimetre into the belt. - page 12 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 13: Monthly Inspection

    Check the tension of the belts/pow erband. Retighten the belts if your can press over 0.5 centimetre into the belt. Stainless steel tension bolt M16x140 art.no. 16140 Image 5.3.1 - page 13 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)
  • Page 14: Halfyearly Inspection

    Maintenance/inspection list Along w ith every maintenance inspection the maintenance checklist on the next page must be filled out. We recommend sending the checklist to RTI after filling it out. Mail: info@rti.nl Fax: (0031) 544-376499 Hold on to the checklist, the checklist can be handed to the mechanic w hen the next maintenance service is due or w hen the installation needs to be repaired.
  • Page 15: Maintenance Checklist

    O -- Check pressure valve for 2.5 bar O -- Check functioning of indicators O -- Check the engine for unusual sounds O -- Clean the w indow pane - page 15 of 15 – Instruction and operat ing manual CVS SiloKing 1500 Pow erband driven (for-030/031013)

Table of Contents