Advertisement

Quick Links

T
a
k
e
d
o
E
n
e
r
g
y
T
a
k
e
d
o
E
n
e
r
g
y
®
®
http://www.sms.bo.it
USER MANUAL
3.1
05-11-2015
D. Cavalli
REV.
DATE
R.T. Check and Approval

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAKEDO ENERGY and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SMS TAKEDO ENERGY

  • Page 1 ® ® http://www.sms.bo.it USER MANUAL 05-11-2015 D. Cavalli REV. DATE R.T. Check and Approval...
  • Page 2: Table Of Contents

    7 - PROGRAMMING AND MONITORING KEYPAD (OPTION) ... Page 6 8 - CHECKS AND MAINTENANCE ............Page 8 9 - DIMENSIONS AND WEIGHT ............Page 9 VACON DECLARATION OF CONFORMITY ........Page 10 TAKEDO ENERGY USER MANUAL Release 3.1 dated 05-11-15...
  • Page 3: Introduction

    .. TAKEDO ENERGY is a device which “returns” the excess energy to the mains: in this way, rather than heat the environment, it reduces the consumption, since the recovered energy feeds the other loads of the system: operation, brake, car light, etc..;...
  • Page 4: Connections

    90 degrees angle. 2 - The earth and the shield of the cable that connects TAKEDO ENERGY to the main inverter BUS must be connected, inside the main inverter, to the same terminal in which the building earth cables are connected.
  • Page 5: Application Diagram

    IMPORTANT If the existing motor inverter is provided with an INSIDE FILTER, FILTER you must install an external added filter, so that the connection of TAKEDO ENERGY can be carried out as shown in the figure. CABLE 4x2,5 TAKEDO ENERGY...
  • Page 6: Programming And Monitoring Keypad (Option)

    7 –PROGRAMMING AND MONITORING KEYPAD (OPTION) The keypad for control and configuration is not included in the TAKEDO ENERGY, but it is supplied as an option because, for the operation of the device no parameterization is required. About the use of the keypad please refer to the VACON original manual (NXP series), www.vacon.com...
  • Page 7 Slot error: Optional board or connection slot Check board and slot faulty. Contact SMS. . If other types of fault should occur, please contact SMS. TAKEDO ENERGY USER MANUAL Release 3.1 dated 05-11-15...
  • Page 8: Checks And Maintenance

    3- Check that inverter function is <<normal>> and there is no abnormal overheating. 8.1 TEST MEGGER Insulation tests are normally not required on TAKEDO ENERGY. If necessary, you must disconnect the terminals L1, L2, L3, B + and B-and short circuit them together, checking the insulation between this node and ground.
  • Page 9: Dimensions And Weight

    Fix box top with n.2 hook rawl plugs Fix handle to plate with n.2 M6 hex Fix handle to plate screws with n.2 M6 hex screws For further information and advice contact: TAKEDO ENERGY USER MANUAL Release 3.1 dated 05-11-15...
  • Page 10: Vacon Declaration Of Conformity

    Fix handle to plate Fix handle to plate with n.2 M6 hex with n.2 M6 hex screws screws Fix plate to base with Fix plate to base with n.3 M5 screws n.3 M5 screws TAKEDO ENERGY USER MANUAL Release 3.1 dated 05-11-15...

Table of Contents