Operations to be carried out only in conjunction with the
Trio V2 - Trio Mono V2 pack.
- Tighten the brackets (F and G) to the Domus Container as shown
in Fig. 6g.
Fig. 6g
Fig. 6h
T O
R N
T U
L
R E
N E
P A
R P
O M
F R
O W
L
N E
F L
P A
M P
F
G
H
G
23
- Fit the electrical panel (H) on the bracket (G) as shown in Fig. 6h.
Once completed the installation, fix everything with the screws
supplied (Fig. 6h).