Download Print this page
Bioprom AIR BIO Operation Manual

Bioprom AIR BIO Operation Manual

Electronic control unit for solid fuel boiler

Advertisement

Quick Links

OPERATION MANUAL FOR
AIR BIO
ELECTRONIC CONTROL UNIT FOR
SOLID FUEL BOILER
Kharkov city
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the AIR BIO and is the answer not in the manual?

Questions and answers

Summary of Contents for Bioprom AIR BIO

  • Page 1 OPERATION MANUAL FOR AIR BIO ELECTRONIC CONTROL UNIT FOR SOLID FUEL BOILER Kharkov city...
  • Page 2 Prior to carrying out of any actions associated with hooking up power supply wires, please, make sure that AIR BIO control unit (hereinafter referred to as Controller) is not connected to the electric power network! Assembling and connection to the electric power network shall be done by the specialist with the corresponding authority for this type of work.
  • Page 3 Picture1 - AIR BIO Hookup Diagram Picture 2 – AIR BIO Hookup to Central Heating System Diagram...
  • Page 4 Picture 3 – Diagram of hooking up sensors, external alarm system, and loads on Controller’s board 1.3 AIR BIO Application Benefits If using AIR BIO Control Unit for the solid fuel boiler the operator gets the following advantages: - fuel significant saving; because there is a capability to control burning intensiveness;...
  • Page 5 2. Description of the Controller components and control elements Picture 4 – Controller External View Power switch is intended for switching ON/OFF AIR BIO Control unit. Safety fuse connector in intended to protect the unit from short circuit. Control unit screen displays the boiler operation mode. When entering the «MENU» it displays the menu items and modes for setting up the respective items.
  • Page 6: Operation

    AIR BIO renews the fan operation (back to operation mode). When controlling the fan operation in «Standby» mode, the Controller carries out periodic «Blow Off» of the boiler.
  • Page 7 In this case it is considered that the boiler died down and further fan operation is not reasonable. When heat carrier temperature in the boiler drops lower than +5ºС, AIR BIO will automatically switch on the central heating pump. This function is intended to prevent the heat carrier from freezing in the heating system.
  • Page 8 energized). This menu section is intended for the forced switching on and switching off devices and units hooked up to the Controller. Menu Functions: а.) Screw: ON/OFF This function allows switching on fuel supply in a forced manner for filling the screw with fuel during its first start-up, clean-up, or check-up.
  • Page 9 Pause time: breaks between deliveries in «SUPPORT» mode are set up 1 – 250 min. ІІІ.) Screw switch off: ON/OFF This function is intended for emergency switch off or switch on of fuel delivery as well as when using AIR BIO without automatic fuel supply.
  • Page 10 3.3.5 Boiler Operation Mode Selection This function is intended for selecting one of three modes of boiler operation. І. House Heating: ON/OFF When activating this mode the heating system will give priority to heating the line of the central heating pump. ІІ.
  • Page 11 3.3.7.5 Unit switch off temperature: 10 – 75°С If boiler temperature drops lower than the preset one AIR BIO Controller moves to Standby mode. It is considered, that fuel in the bunker is over and further operation is not reasonable.
  • Page 12 Pumps 6.1. Pumps switch on temperature 5°С 6.2. Pumps hysteresis Adjuster Menu 7.1. Screw alarm switch on temperature 7.2. Screw operation during alarm 1 min. 7.3. Factory settings Factory reset NO\YES 7.4. Sensors switch off 7.4.1. Hot water supply sensor 7.4.2.
  • Page 13 6 APPLICATION INSTRUCTIONS FOR AIR BIO 6.1 Operating Restrictions AIR BIO Controller for solid fuel boilers has the following operating restrictions: Parameter Description AIR BIO from 40 to 90, non- Permissible humidity, % condensing Permissible atmospheric pressure, kPa from 84 to 107...
  • Page 14: Technical Maintenance

    As well as AIR BIO Controller provides for hooking up the external alarm system that will create closed-loop (unclosed-loop) in case of emergency situation.
  • Page 15: Warranty Obligations

    - There should be no dust, fumes of acid and alkaline as well as aggressive gases in the premises air. 8 WARRANTY OBLIGATIONS 1. The life cycle for AIR BIO Controller determined by LTD «Bioprom Company Kharkov» is not less than 10 years. 2. LTD «Bioprom Company Kharkov» provides warranty for AIR BIO Controller for the period of 18 months from the date of sale but not longer than 24 months from the date of manufacture.
  • Page 16: Unit Disposal

    9 REGULATORY HISTORY All products of LTD «Bioprom Company Kharkov» undergo the certification process (certificate validation) on a yearly basis as well as periodic test for interference immunity in the State Enterprise «KharkovStandardMetrology». Certificates can be found on the...
  • Page 17 10 INFORMATION ON PRICES AND PURCHASE CONDITIONS All the data on prices and purchase conditions for the products of LTD «Bioprom Company Kharkov» can be found on the company sites: www.bioprom.com.ua www.bioprom.kh.ua www.bioprom.ua www.bioprom.kharkov.ua For all issues relating to warranty and post-warranty service, please feel free to contact us at the address of: 126/1, Plekhanovskaya Str., Kharkov city, 61037.Telephone of Service...
  • Page 18 For Notes...
  • Page 19 For Notes...
  • Page 20 Warranty Ticket # ____________________ In accordance with the mentioned conditions the warranty for AIR BIO Controller is granted for a period of 18 (eighteen) months from the date of sale but not longer than 24 months from the date of manufacture, and on conditions that the Controller is used in strict compliance with the manufacturer’s specification.