Tel: +90 312 811 27 27 Fax: +90 312 811 27 28 www.evaelektromekanik.com All rights reserved. Any part of this catalogue can not be copied without the permission of the right holder. It can only be copied and augmented with the written permission of EVA ELEKTROMEKANİK SAN. VE TİC. LTD. ŞTİ.
1. GENERAL FEATURES 1.1 GENERAL SECTIONS 1.2 STANDARDS 1.3 CHARACTERISTIC FEATURES 2-LOADING - UNLOADING - TRANSPORTING 2.1 TRANSPORTING WITH FORKLIFT 2.2 TRANSPORTING OVER THE PIPE 2.3 TRANSPORTING BY LIFTING SLING 3 - INSTALLATION 3.1 - TOOLS LIST REQUIRED DURING INSTALLATION 3.2 - MATERIALS LIST SENT WITH THE CUBICLE 3.3 - CUBICLE’S PLACEMENT 3.4 - CONNECTING THE CUBICLES TO EACH OTHER...
1.2 STANDARDS eva-36-CR SWITCHING SYSTEM IS FULLY COMPLIANT WITH TS EN / IEC 62271-1, TS EN / IEC 62271-200 STAN- DARDS. ALSO, THIS SWITCHING SYSTEM HAS A PROTECTION CLASS OF IP3X ACCORDING TO TS EN / IEC 60529 STANDARDS.
1.3 KARAKTERİSTİK ÖZELLİKLER Rated Voltage (kV) Type eva-36-CR Main Busbar Rated Current (A) 630 – 1250 Feeder Rated Current 630 – 1250 Rated power frequency withstand voltage (KV rms) Rated Lightning Impulse Withstand Voltage (kV) Rated Short Circuit Withstand Current (rms)
2- LOADING - UNLOADING - TRANSPORTING Loading, unloading and transporting methods of the MMMH type cubicles are shown below: 2.1 TRANSPORTATING WITH FORKLIFT Cubicles can be carried either way as shown in the the pictures below. In addition, forklift is usually used to unload the cubicles from the truck and transport them to the assembly site.
2.3 TRANSPORTING BY LIFTING SLING Cubicles can be transported with the help of sling lifting by means of a crane. Usually it is used while unloading the cubicles from the truck. 3 - INSTALLATION 3.1 - TOOLS LIST REQUIRED DURING INSTALLATION Tools Dimensions Quantity...
3.3 - CUBICLE’S PLACEMENT 3.3.1 Placement inside the Building: • Place the MMMH Type cubicle on a channel inside the building in accordance with the dimensions indicated in the right picture. • • A 5cm gap should be left between the placed cubicles on the right or the left side inside the building and the wall.
THE BASE METAL HOLE DIMENSIONS OF THE CUBICLE The lower holes dimensions are provided in the picture below. Based on these dimensions a steel peg or an iron dowel should be used. Then the holes to be fixed with M10x50 bolts. MV Cable Entry Point 3.4 - CONNECTING THE CUBICLES TO EACH OTHER Pull the lifting hooks upwards (See below pictures).
In accordance with the single line diagram of the facility, combine the square-shaped holes of the cubicles side by side using M8x20 bolts. IMPORTANT WARNING: If the surface on which the cubicles will be mounted is not flat, the cubicles’ covers may not be fitted properly and also problems may be caused in the main busbar connection.
3.6 – EARTHING BUSBARS CONNECTION Connect the grounding busbar points of the two adjacent cubicles with a copper conductor that is already provided with the cubicle using bolts as shown in the right picture (3). GROUNDING CONNECTION POINT 3.7 - CONNECTING THE CUBICLES› ARRAY TO THE MAIN GROUNDING SYSTEM OF THE FACILITY •...
3.8 –PASSAGES OF AUXILIARY SERVICE AND CONTROL CABLES FROM CUBICLE TO ANOTHER • The sockets in the LV cabinet are used for the passage of auxiliary service and control cables from cuibcle to another. See the left picture (5). • Take either the female or the male socket found on the cable passage hole in the LV cabinet and connect it to its corresponding socket found on the cable passage hole of...
3.9 - CONNECTION OF MV CABLES 1. Open the cubicle’s cable connection compartment door. 2. Mount the cable terminal caps ( internal type ) on the MV cable terminals in accordance with the related instructions. 3. Connect the mounted terminals to the cubicles’s output terminals. See picture (7).
During that, check the mechanical interlocks are operating properly and no problems are occured. 2. Please contact EVA ELEKTROMEKANİK on (0090 312 811 2727) if any problem is encountered during the above points.
5 - MAINTENANCE INSTRUCTIONS AND RECOMMENDATIONS FOR THE AIR INSULATED METAL ENCLOSED CUBICLES MMMH TYPE IMPORTANT WARNING: Before starting the maintenance work; the Cubicles and the Main Busbar must be DE-ENERGIZED and the GROUNDING must be taken too. 5.1-MAIN BUSBAR COMPARTMENT To find the main busbar, remove the bolted connections of the covers found on the upper part of the cubicles.