Download Print this page

Palram Applications BeIIa 8x8 Instructions Manual page 3

Advertisement

IMPORTANT
Please read
these
instructions carefully before you start to
assemble this greenhouse.
Keep
these instructions
in
a
safe
place
for future
reference.
»
Customer
Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on
the title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
»
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during panels' sliding.
Always wear
shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools make sure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive winds.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse. Make
sure
there
are no
hidden pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
mainly
as
a
greenhouse.
Note:
You
should anchor the greenhouse directly to
a
solid
foundation;
Make
sure
that there
are no
obstructions between the assembly
area
and the final position.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear panels.
»
Tools
&
Equipment
Work gloves
Phillips head screwdriver
Adjustable Spanner /Wrench
Leveler
Tape
measure
Step
ladder
Scissors
Electric screwdriver
(
lOmm, 7mm, Phillips)
Lubricant (Optional)
T001
-
Special
tool for
Screws
411
and nuts
412
Before
Assembly
v
Selecting
a
site:
-
The
greenhouse must
be
positioned and fixed on
a
flat
level surface.
-
Choose
a
sunny position away from overhanging trees.
V
We
strongly recommend this greenhouse to
be
secured
directly to
a
solid concrete
foundation.
V
This
is a
multi-part
assembly best achieved by
two
people.
Allow
at least
half
a
day
for the assembly
process.
V
Take all
components
&
parts
out of the
packages. Sort
the parts and check against the
content
parts
list.
Parts
should
be laid
out
close at hand. Keep all small parts (screws etc.)
in
a
bowl
so
they
do not get
lost.
I
Please
note multi-sided profiles
are used in
this greenhouse.
As
a
result some holes
in
the profiles
are
not
used
during
assembly.
Please
review entire instructions before starting. Carry out the assembly
steps in
exact
order.
IR
The
drawings
in
this manual
are
designed for
8'x
8'greenhouse
+
4'Extension
Kit.
Please
note that content
list refers
only for
8x8
greenhouse.
Note:
all
the extension module
steps are
marked
with
a
dashed outline, should
be
performed during the greenhouse assembly
process.

Advertisement

loading