BEER Uno Top Hot Instructions For Installation And Start-Up

BEER Uno Top Hot Instructions For Installation And Start-Up

Mini-vitrine

Advertisement

Quick Links

Uno Top Hot
Mini-Vitrine
Instruction for installation and start up

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Uno Top Hot and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BEER Uno Top Hot

  • Page 1 Uno Top Hot Mini-Vitrine Instruction for installation and start up...
  • Page 2: Table Of Contents

    Glazing / Danger of accident ..................5 Start up ..........................7 Option Timer - check water level ................. 10 Transport and installation of Uno Top Hot ................11 Electrical connection ......................11 Classification and dimensions .................... 12 Technical data ........................12 Units with cold and warm light (warm light dimmed or not dimmed) ......
  • Page 3: Introduction

    The manual must always be kept close to the unit and easily accessible. Important! Beer Grill AG cannot assume any responsibility or warranty obligations for any damage sustained due to non-adherence to the installation and operating instructions or due to improper use.
  • Page 4: Information Of Danger

    3 hours. See markings on both sides of the bins. Use the built-in timer. Timer and flashlight is an option and has to be ordered separately. Beer Grill AG repudiates liability for consequential damage to ascribe to running the Uno Top without water! Heating dry (without steam) Uno Top has to be equipped with a universal frame (accessories) in place of a water bin.
  • Page 5: Attention! Danger Of Burning

    Damaged glass panels must be replaced immediately, glass holders refitted by qualified personnel. In a pinch, continue working without the glass panels until the required spare parts arrive. Beer Grill AG Beer Grill GmbH Allmendstrasse 7 Tel. +41 (0)56 618 7800 Körnerstrasse 14 a...
  • Page 6 The panels can be partly or completely lifted out of their holders for cleaning. Beer Grill AG decline any liability for damages resulting from wrongly fitted or damaged glass panels and glass holders. Figure 1 To fit the front glass panel: Remove the front panel, fold up the sneeze screen.
  • Page 7: Start Up

    Danger of fire! Before first start up remove all packing and padding material. Construction The Uno Top Hot consists of basic unit, an upper part and a water bin. Uno Top Hot with warm and cold light: Ceran glass Water bin...
  • Page 8 (dimmed version) option 1 x on base plate outside Mains cable 1 x on base plate inside Beer Grill AG Beer Grill GmbH Allmendstrasse 7 Tel. +41 (0)56 618 7800 Körnerstrasse 14 a Tel. +49 (0)71 61 659 876 info@beergrill.com...
  • Page 9 Uno Top Hot with heating channel: Ceran glass plate Water bin Assembling Control panel in basic unit (5) Dimmer to Insert M5 for (2) pilot light infrared heater potential equalisation (1) Energy controller for heating element Mains cable Rating plate:...
  • Page 10: Option Timer - Check Water Level

    Do not run the Uno Top Hot with empty water bins. Fill water bins up to the marks with water (for wet run) or replace bins by universal frames (for dry run). Use decalcified water only! If you do not use decalcified water, we recommend adding 1 tablespoon of vinegar to the water.
  • Page 11: Transport And Installation Of Uno Top Hot

    Transport and installation of Uno Top Hot Transport / packing Remove all packing and transport materials. Installation / base The unit has to be placed on a flat and levelled base, with a minimum basic size like the Uno Top Hot (see point 1 dimensions).
  • Page 12: Classification And Dimensions

    Designation W x D x H (mm) height (mm) max. height (mm) L x W (mm) Uno Top Hot GN 1/1-40 398 x 584/784 x 544 530 x 325 Uno Top Hot GN 1/1-100 398 x 584/784 x 604 530 x 325 2 piece à...
  • Page 13: Cleaning And Servicing

    Cleaning and servicing Cleaning The Uno Top Hot is an electrical appliance. Disconnect the unit of the mains (pull off plug/switch off main switch or take off fuses). Cleaning agents Use a smooth cloth and a usual, non rubbing household cleaner. Do not clean the silicone joints of the ceran heating element (heating below) with any cleaning agent.
  • Page 14 When inserting the new Infrared-Heater with the incl. integrated splinter shield, it must be taken into consideration, that the lamp be inserted exactly according to the following drawings: Attention – danger of burning! Beer Grill AG Beer Grill GmbH Allmendstrasse 7 Tel. +41 (0)56 618 7800 Körnerstrasse 14 a...
  • Page 15: Guide To Install The Touch-Guard (Optional)

    Guide to install the touch-guard (optional) Hold the touch-guard with both hands Slightly pull apart Clam the touch-guard on the lamp cover Beer Grill AG Beer Grill GmbH Allmendstrasse 7 Tel. +41 (0)56 618 7800 Körnerstrasse 14 a Tel. +49 (0)71 61 659 876 info@beergrill.com...
  • Page 16: After Sales Service

    In case of an electric breakdown contact the after sales service. Before calling check mains connecting cable and fuses. When contacting after sales service always indicate serial-no. and type (on rating plate) of the Uno Top Hot. United Kingdom: Total Equipment Servicing Limited...
  • Page 17: Appendix

    11 Appendix Drawing 63-M-08-109-00A Spare parts list Uno Top Hot GN 1/1, straight glass Drawing 63-M-08-110-00A Spare parts list Uno Top Hot GN 1/1, curved glass Drawing 63Ma017-00A Spare parts list Uno Top Hot Q 40 Drawing 63Ma016-00 Spare parts list Uno Top Hot GN 2/1...
  • Page 18 UNO To p 40/1 00 GN 1 /1 avec po nt d'éclairage, lumière infraro uge variable UNO To p 40/1 00 GN 1 /1 with light bridge, infrared light dimmed Verkablungsschema Serien- Nr. Auslieferdatum Uno Top Hot Schéma de câblage Wiring diagram 58088 01.04.2008 BEER GRILL AG Datum 14.06.2012...
  • Page 19 UNO To p 40/1 00 GN 1 /1 avec po nt d'éclairage, lumière infraro uge variable UNO To p 40/1 00 GN 1 /1 with light bridge, infrared light dimmed Verkablungsschema Serien- Nr. Auslieferdatum Uno Top Hot Schéma de câblage Wiring diagram 58088 01.04.2008 Datum 14.06.2012...
  • Page 20 Ers. für: 3308127 05.06.2012 on request, RAL ..Ind. Datum Name Aenderung Ind. Datum Name Aenderung Komm. Schneidbretteinsatz Glashalter, Porte-vitre, Glass-holder Uno Top Hot, Ersatzteile-Liste Gezeich. S.Ceker 05.12.2008 Plance à trancer Geprüft Cutting-board Liste des pièces d'échanger Anthrazit, 3306140 Blatt Massstab Spare parts list Kundenspez., selon client,...
  • Page 21 Ind. Datum Name Aenderung Komm. Plance à trancer Glashalter, Porte-vitre, Glass-holder Gezeich. S.Ceker 05.12.2008 Cutting-board Uno Top Hot, Front gebogen, Ersatzteile-Liste Geprüft 3308126 Anthrazit, 3306140 Partie frontale coudée, Liste des pièces d'échanger Blatt Massstab Schneidbrettschale Kundenspez., selon client, Bended front glass, Spare parts list...
  • Page 22 Ind. Datum Name Aenderung Ind. Datum Name Aenderung Komm. Side glass Gezeich. F.Schuler 06.06.2011 Uno Top Hot Q 40, Ersatzteile-Liste Geprüft Anthrazit, 3306146 Liste des pièces d'échanger Anthrazit, 3306143 Blatt Massstab Kundenspez., selon client, Spare parts list Kundenspez., selon client, on request, RAL ..
  • Page 23 Ind. Datum Name Aenderung Ind. Datum Name Aenderung 3308972 Komm. Gezeich. F.Schuler 26.04.2011 Steckspiegel Uno Top Hot GN-2/1, Ersatzteile-Liste Geprüft Anthrazit, 3306140 Miroir à raccrocher Liste des pièces d'échanger Blatt Massstab Kundenspez., selon client, Insertting mirror Spare parts list 3308974 on request, RAL ..

Table of Contents