Do you have a question about the F1178 and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Landscape Fusion F1178
Page 1
SSEMBLY NSTRUCTIONS Assembly Instructions for F1178, In Ground Euro Style Bike Rack To prevent scratching on any of the finished pieces, we recommend assembling the unit on packing material (paper and cardboard). Do not drag assembled unit on any surface. The assembly is a two- person operation.
Page 2
SSEMBLY NSTRUCTIONS 12.00 24.00 26.00 Diagram #1 Diagram #2 Note: 1. Diagram #2 shows a typical depth of pipe to be submerged in cement. The bottom flange is to be submerged 10” into cement. Crown the cement to optimize drainage. Cement walls should be vertical to minimize the effects of frost upheaval.
Need help?
Do you have a question about the F1178 and is the answer not in the manual?
Questions and answers