Routine And Special Maintenance; Pre-Installation Requirements - glass 1989 LINEA DUO Installation & Maintenance Manual

Table of Contents

Advertisement

EN
All measurements are in mm.

PRE-INSTALLATION REQUIREMENTS

IMPORTANT: Given the high capacity and weight of the
and building services engineering study is necessary.
GROUNDWIRE.
EQUIPOTENTIAL CONNECTION.
The
following
manufacturer) are required for installation:
kit and no other types of piping must be used.
After cleaning, rinse thoroughly with plenty of water to
remove all traces of detergent and dry with a soft cloth.
IMPORTANT:
Rinse thoroughly with plenty of water to remove all traces
of detergent.
WOOD FINISH SURFACES
C.V.
after cleaning.
IMPORTANT:
accessories
(not
supplied
pipes provided in the
ROUTINE AND
SPECIAL MAINTENANCE
rinse the surface and dry it
by
the

Advertisement

Table of Contents
loading

Table of Contents