Download Print this page

Advertisement

Quick Links

PREPARE THE GROUND, UNWRAP THE
LAY OUT THE COMPONENTS, FIND THE
1/19
PACKAGE,
TOOLS.
M8×60
BENTE III 28
× 55
× 370
× 10
× 30
× 12
× 30

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bente III 28 and is the answer not in the manual?

Questions and answers

Summary of Contents for Holz-Blech Bente III 28

  • Page 1 BENTE III 28 PREPARE THE GROUND, UNWRAP THE PACKAGE, LAY OUT THE COMPONENTS, FIND THE TOOLS. × 55 × 370 × 10 × 30 M8×60 × 12 × 30 1/19...
  • Page 2 BENTE III 28 LAY OUT THE FOUNDATION BEAMS AB=CD SQUARE IT BY MEASURING FROM CORNER TO CORNER. 0° MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE. CHECKING ALL DIRECTIONS, 2/19 INCLUDING CORNER TO CORNER.
  • Page 3 BENTE III 28 LAY OUT THE BOTTOM LOGS, ATTACH TO THE FOUNDATION. × 5 × 12 A LG-1 2 BL-1 5×70 6×140 B LG-1 THE WALL LOGS WILL HANG OVER 1 BL-1 THE FOUNDATION BEAMS APPROXIMATELY 5MM. THIS OVERHANG 1 BL-1 3/19 IS DESIGNED AS A RAIN DRIP.
  • Page 4 BENTE III 28 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS. × 4 × 5 2 LG-5 6×140 5×70 1 LG-1 1 LG-1 4/19...
  • Page 5 BENTE III 28 AFTER PLACING 3-4 ROWS OF WALL LOGS, TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED, TO TIGHTEN THE LOGS. HITBLOCK 5/19...
  • Page 6 BENTE III 28 SLIDE THE DOOR IN, ATTACH THE HANDLE. BDD3R LOGS IN PLACE 6/19...
  • Page 7 BENTE III 28 DON`T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3-4 ROWS. 7/19...
  • Page 8 BENTE III 28 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS. × 4 GABLE A TL-1 B TL-1 LOGS IN PLACE 8/19...
  • Page 9 BENTE III 28 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS. × 6 9/19...
  • Page 10 BENTE III 28 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 6 SCREWS, 3 INTO EACH NEXT, SAW THE LAST BOARD TO MAKE IT FIT. × 186 10/19...
  • Page 11 BENTE III 28 INSERT FOR THE FASCIA TRIMS SCREWS AFTER EVERY 0,5 METERS. × 28 11/19...
  • Page 12 BENTE III 28 EAVES EDGES GO ON TOP OF THE ROOFING*. *(NOT INCLUDED) × 28 12/19...
  • Page 13 BENTE III 28 ATTACH ROMBS WITH SCREWS. ROMB × 4 13/19...
  • Page 14 BENTE III 28 16 SCREWS INTO THE FIRST FLOORBOARD, INTO EACH NEXT, SAW THE LAST BOARD TO MAKE IT FIT. × 162 14/19...
  • Page 15 BENTE III 28 SAW THE BASEBOARDS AND ATTACH WITH NAILS EVERY 0,5 METERS. × 30 15/19...
  • Page 16 BENTE III 28 DRILL THROUGH THE WALL, HOLE MUST BE AT THE BOTTOM OF THE OVAL, ATTACH WITH BOLT. × 12 WINDBOARD 16/19...
  • Page 17 BENTE III 28 IF DOOR IS TILTED, PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90º. 90º 90º 17/19...
  • Page 18 BENTE III 28 DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM, ADJUST 3 SCREWS ON DOOR HINGES. 18/19...
  • Page 19 BENTE III 28 WHEN THE HOUSE IS ASSEMBLED, YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL, PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD. 19/19 100%...

This manual is also suitable for:

4000006-1