Do you have a question about the Evolv PAC 864/576 and is the answer not in the manual?
Questions and answers
Summary of Contents for CORNING Evolv PAC 864/576
Page 1
Evolv Corning PAC 864/576 ™ Pad-Mounted Cabinet 003-1072-AEN, Issue 2 related literature | Search www.corning.com/opcomm. Click on “Resources.” 003-763 Instruction, OptiTect LS S plitter Module ® 006-111 Instruction, Optical Access Connector Cleaning Kit 000-228 Instruction, hardware-Mounting Kits for OptiTect Cabinets...
Page 2
The following carton contents are included but not illustrated: PAC 864/576 pad-mounted cabinet prestubbed with distribution and feeder cables in length specified by the customer Bag with extra adapter and connector dust caps hardware-mounting kit containing: (1) Installation instruction (003-756) (1) Installation instruction (000-228) (6) Split-lock washers (6) Flat washers...
Storage and Transportation The shipping container and its contents must be stored indoors in a vertical position in the original packaging. A forklift or hand truck capable of lifting approximately 250 pounds is required to unload or transport the product in its shipping container prior to unpacking. Observe all local safety precautions when moving the container.
Page 4
Pad-mounting Preparations Unlocking the cabinet 216B Tool Click 216B Tool TPA-6658 STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 4 OF 11...
Page 5
Pad-mounting Diagrams Mounting Template PAC 864/576 Metric 83,5 mm 83,5 mm 80,5 mm 80,5 mm MOUNTING HOLES Front EXPANSION DISTRIBUTION #2 62 mm 62 mm EXPANSION DISTRIBUTION #4 EXPANSION DISTRIBUTION #1 107,5 mm 107,5 mm EXPANSION DISTRIBUTION #3 EXPANSION FEEDER/PASS-THRU #1 EXPANSION FEEDER/PASS-THRU #2 202,5 mm FEEDER/PASS-THRU #1...
Remove Side Panels Note: Side panels may be packaged separately 8 mm TPA-6661 Nut driver STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 6 OF 11...
Page 7
Pad-mounting Preparations 8 mm nut driver Isolation pad (X2) TPA-6662 STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 7 OF 11...
Ground the Cabinet Click TPA-6663 TPA-6664 STANDARD RECOMMENDED PROCEDURE 003-1072-AEN | ISSUE 2 | MARCh 2021 | PAGE 8 OF 11...
Page 9
Cable Toning Access to the terminals allows for selective cable toning. Step 1: Open the door of the ISO ground assembly using a 216B tool. (Figure 3). Step 2: Loosen the terminal nut on the applicable cable to disengage (or “un-ground”) the cable.
Page 10
Step 3: Clean the adapter using a dry process. Corning Optical Communications recommends use of the Corning IBC™ Brand Cleaner (Corning p/n CLEAN- PORT-2.5) to clean the connectors and adapters before mating. Follow the instructions provided with the cleaning tool.
Need help?
Do you have a question about the Evolv PAC 864/576 and is the answer not in the manual?
Questions and answers