Installa on of the BriteSpot Fiber-Op c Temperature Sensor has been engineered to be simple and straigh orward. The
following manual will describe in detail the 3 steps needed for installa on. No specialized knowledge of fiber op cs is
necessary. A basic understanding of switchgear topology and moun ng methods is required.
Required for Installa on
Tools for Fiber Moun ng:
Adjustable Wrench
1.5 mm Allen Key
Guillo ne Cu er
1- Moun ng Fixture and Op cal Fiber Installa on
A - Secure the Moun ng Fixture to Busbar and Connect Fiber
I. Insert the screw with the washer through the
fixture and busbar.
B - Route the Fiber to Low-Voltage Cabinet
!
Do NOT bend fiber ghter
than 12 mm (1/2") radius
Keep away from sources of
excessive heat whenever
possible. Fiber probe shall not
be a ached to surfaces with
te m p e rat u re s exc e e d i n g
100ºC or 200ºF.
Fiber
- MAX 100ºC
Sensor Tip - MAX 120ºC
Powell Canada Inc,
Suite 201, 55 Gos ck Place
North Vancouver, BC, V7M 3N2
Components for Hardware Installa on:
35 mm DIN rail (6"-8") and moun ng
hardware
CAT5 Ethernet cable (if connec ng to SCADA or
computer.
II. Insert the washers and secure it with a nut.
Ensure the hole for fiber inser on is pointed in
the direc on of the fiber rou ng.
R
!
Quick Start Guide
III. Insert fiber into the holding fixture and secure it
Do not fasten or a ach ANY
moun ng hardware ( e-wraps,
etc.) to at least a 30 cm (12")
length of fiber between the
por on of the probe at high
v o l t a g e a n d i t s fi r s t n o n -
energized point of contact.
Power Supply Requirements:
Voltage: 12-24 VDC (0.12A@24VDC)
Power: 3 Wa s (Max)
with a 1.5 mm hex screwdriver.
Avo i d r u n n i n g fi b e rs I n t h e
direc on of the fold of the boot to
!
minimize bending and damage of
the fiber.
Need help?
Do you have a question about the BriteSpot Fiber-Opc and is the answer not in the manual?
Questions and answers