SHOWTEC MAT-250+ Manual

SHOWTEC MAT-250+ Manual

Line array tower

Advertisement

Quick Links

MANUAL
ENGLISH
MAT-250+ Line Array Tower
V1
Ordercode: 70873
Highlite International B.V. – Vestastraat 2 – 6468 EX – Kerkrade – the Netherlands

Advertisement

Table of Contents
loading

Summary of Contents for SHOWTEC MAT-250+

  • Page 1 MANUAL ENGLISH MAT-250+ Line Array Tower Ordercode: 70873 Highlite International B.V. – Vestastraat 2 – 6468 EX – Kerkrade – the Netherlands...
  • Page 2: Table Of Contents

    MAT-250+ Line Array Tower Table of contents Warning ....................................2 Safety Instructions ................................. 2 Rigging .................................... 4 Return Procedure ................................4 Claims ....................................4 Description of the device ..............................5 Overview ..................................5 Installation ................................... 6 Set Up and Operation ............................... 6 Winding Up ..................................
  • Page 3: Warning

    Save the carton and all packing materials. In the event that a fixture must be returned to the factory, it is important that the fixture be returned in the original factory box and packing. Your shipment includes: ● Showtec MAT-250+ Line Array Tower ● User manual Safety Instructions Every person involved with the installation, operation and maintenance of this device has to: ●...
  • Page 4 If device was dropped or struck. Have a qualified engineer inspect for safety before operating. ● If your Showtec device fails to work properly, discontinue the use immediately. Pack the unit securely (preferably in the original packing material), and return it to your Showtec dealer for service.
  • Page 5: Rigging

    MAT-250+ Line Array Tower Rigging Please follow the European and national guidelines concerning rigging, trussing and all other safety issues. Do not attempt the installation yourself ! Always let the installation be carried out by an authorized dealer ! Improper installation can cause serious injuries and/or damage of property! Return Procedure Returned merchandise must be sent prepaid and in the original packing, call tags will not be issued.
  • Page 6: Description Of The Device

    MAT-250+ Line Array Tower Description of the device Features The Mammoth Series stands are designed in the Netherlands and produced in Europe, ensuring the best price-performance ratio possible. All materials were carefully chosen to ensure a long lasting quality. ● Fixation of tower sections to working height with safety pins ●...
  • Page 7: Installation

    MAT-250+ Line Array Tower 01) Safety pin a: in position b: activated c: released 02) Winch handle 03) Transport support 04) Safety pin 05) Attachment positions for the outriggers 06) Forklift 07) Profile transport support 08) Outrigger 09) Outrigger crank 10) Outrigger stabilizer Installation Remove all packing materials from the MAT-250+ Line Array Tower.
  • Page 8: Elevating

    MAT-250+ Line Array Tower Elevating 01) Turn the winch handle (02) clockwise to lift the load to the desired position. Make sure that the safety pins (01) are in (01b) position while lifting. 02) To avoid overloading, do not unnecessarily separate the line array from the tower. Always follow the loading instructions (fig.
  • Page 9: Maintenance

    Suspect three potential problem areas as: the winch handle, the steel cable, the forklifts. 01) The winch handle. Return the line array tower to your Showtec dealer. 02) The steel cable. Return the line array tower to your Showtec dealer.
  • Page 10: Falling Objects

    ● At least once a year, have the line array tower inspected by a professional, to eliminate any potential risks Product Specifications Model: Showtec MAT-250+ Line Array Tower Maximum height: 6,5 m Maximum load @20 cm: 250 kg Maximum load @45 cm:...
  • Page 11 MAT-250+ Line Array Tower Ordercode: 70873...
  • Page 12 ©2018 Showtec...

This manual is also suitable for:

70873

Table of Contents