Download Print this page
DCS CACTUS Installation Manual

DCS CACTUS Installation Manual

Floor mounted heated towel rails

Advertisement

Quick Links

CACTUS
Functional and stylish the DCS range of floor mounted heated towel rails look great next to freestanding
baths and compliment any bathroom or ensuite. Towels can be draped or wedged between the
vertical tubes. Overall height 1200mm and 50mm round tube profile.
FEATURES
Low Voltage
Low voltage safe installation in ANY zone
Easy install
ALL floor types, pre-wiring IS required
Ecotimer included (with transformer kit)
Ecotimer
SPECIFICATIONS
Recommeded use Residential and commercial
Materials
Stainless steel 304 grade
FInish
Mirror, Satin and Matte black finish.
Technology
Dry element (no leaks)
Element
Internal
Options
Heated or non heated
disClaimer Products in this specification manual must by regulation be installed by licensed and registered trade people.
The manufacturer/distributor reserves the right to vary specifications or delete models from their range without prior
notification. Dimensions and set-outs listed are correct at time of publication however the manufacturer/distributor
takes no responsibility for printing errors. Tech Page Version 3.4
Power entry
Bottom
Voltage
12V AC safety isolating transformer
Wattage
approx. 80
Standards
AS/NZS:60335.2.43
Safety rating
IPX7 (immersion at 1 metre for 30mins)
CaCtus guide | page
1 of 6

Advertisement

loading

Summary of Contents for DCS CACTUS

  • Page 1 CACTUS Functional and stylish the DCS range of floor mounted heated towel rails look great next to freestanding baths and compliment any bathroom or ensuite. Towels can be draped or wedged between the vertical tubes. Overall height 1200mm and 50mm round tube profile.
  • Page 2: Installation Instructions

    Is there a waterproof Is there a waterproof membrane? membrane? FIGURE 1 FIGURE 2 FIGURE 3 eleCtriCians please ensure a copy of the installation instructions is left with the end user for future reference. 2 of 6 CaCtus guide | page...
  • Page 3 Wire nut connectors Ecotimer Blue Brown Rawl plugs Wall Switch Sealant FIGURE 4 FIGURE 5 eleCtriCians please ensure a copy of the installation instructions is left with the end user for future reference. 3 of 6 CaCtus guide | page...
  • Page 4: Component List

    CaCtus guide | page . After one hour check that the temperature underneath the towelling on each bar is HOT to the touch. The exposed 4. After one hour check that the temperature underneath the towelling on each bar is HOT to the touch. The exposed surfaces should remain warm only.
  • Page 5 If you need to test that the transformer is functioning correctly, EITHER connect the transformer to the towel rail to see if it gets warm, OR temporarily connect a 50W halogen lamp to the transformer to see if it lights up. 5 of 6 CaCtus guide | page...
  • Page 6 1 year from the date of purchase. Products LABOUR AND SPARE PARTS and spare parts which are found upon inspection by DCS to be defective in The labour for the replacement of products and spare parts to which this...