Advertisement

Del Morino srl
, v.Caroni di Sotto 19,
I-52033 Caprese Michelangelo AR Italy
Ph: +39-575-791059
Fax: +39-575-791210
E.mail: export@del-morino.it
http://www.del-morino.it
USE AND MAINTENANCE MANUAL
BACK HOE TYPE RES
RES-e-12 Use and maintenance manual : RES

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RES and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Del Morino RES

  • Page 1 Del Morino srl , v.Caroni di Sotto 19, I-52033 Caprese Michelangelo AR Italy Ph: +39-575-791059 Fax: +39-575-791210 E.mail: export@del-morino.it http://www.del-morino.it USE AND MAINTENANCE MANUAL BACK HOE TYPE RES RES-e-12 Use and maintenance manual : RES...
  • Page 2: Preface

    PREFACE This manual is an integral part of the machine It must always accompany the machine and be kept within reach of the operator. The enclosures mentioned are on integral part of this manual. The purpose of this manual This manual gives information for the correct and safe use of the machine. The owner must read this manual carefully before work with the machine.
  • Page 3: Description

    SE OF THE MACHINE The back hoe type RES is light, handy and easy to use then is suitable to satisfy the requirement of small and medium factory and hobby workers that need to make digging out or material moving not too heavy.
  • Page 4: Technical Specifications

    TECHNICAL SPECIFICATIONS RES 15 RES 15 RES 20 RES 30 RES 50 Arm lenght “A ” 2,20 2,20 2,34 2,54 3,45 Max working height “ B ” 1,60 1,65 1,80 2,00 2,35 Fork depth “ C “ 2,30 2,50 2,75...
  • Page 5: Safety Information

    SAFETY INFORMATION ENERAL REGULATIONS Work only to the daylight. The machine must not be used if there are people, particularly children, or animals close by. The machine must be operated by experienced personnel that have attentively read this manual. Before operating the machine check the operation of the safety devices. Before operating the machine verify that the two feet stabilizers are lowered, that the tractor is stable and that the parking brake is inserted.
  • Page 6: Safety Signs On The Machine

    SAFETY SIGNS ON THE MACHINE In this section, the safety signs on the machine are reproduced and explained. 1. Read the operator manual. 2. Remove the tractor ignition key before maintenance and repair operations. 3. Stay at a safe distance from moving parts when the machine is operating. 4.
  • Page 7: Assembling Instruction

    ASSEMBLING INSTRUCTION STTACHING THE RES TO THE TRACTOR THREE POINT HITCH a) Hook the machine to a crane using cables attached to the lifting points marked “Gancio“. b) Lift and stabilize the machine at the level “H” (300 mm or 1 ft) from the ground and insert two blocks under the base of the two stabilizers.
  • Page 8: Instruction For Use

    INSTRUCTION FOR USE ONTROL a) Lever “1” – Right stabilizer. F = stabilizer down – E = stabilizer up. b) Lever “2” – 1° Arm and Bucket. A = arm up – C = arm down – B = bucket opening – D = bucket closing. c) Lever “3”...
  • Page 9: Before Beginning Digging

    EFORE BEGINNING DIGGING a) Verify the oil level inside the multiplier (see page 12 point a). b) Grease the machine (see page 13). c) Move to the working area. d) Stop the tractor then engage the parking brake. e) Switch on the PTO. Lower the two stabilizers pushing the levers “1”...
  • Page 10: Maintenance Instruction

    MAINTENANCE INSTRUCTION In diagram "A" the maintenance to be done is indicated with the respective intervals to protect the machine. Not following the scheduled intervals can compromise the functionality of the machine and result in the warranty being invalidated. DIAGRAM “A” SCHEDULED MAINTENANCE EACH 150 HOURS EACH 1200 HOURS FIRST START...
  • Page 11: Tank Oil Level- Tank Oil And Filter Substitution

    To refill or change oil use only HYDRAULIC OIL Type NUTO H46, tank capacity: RES10 : 10L, RES15-20.30 : 13 L, RES 50 : 45 L. Refilling or replacement of oil must be made at the intervals prescribed in diagram “A”.
  • Page 12: Multiplier Oil Level- Multiplier Oil Substitution

    ULTIPLIER OIL LEVEL- MULTIPLIER OIL SUBSTITUTION To refill or substitute the oil use only OIL SAE 140 EP, multiplier capacity: 0,28 l. Refilling or replacement of oil must be made at the intervals prescribed in diagram “A”. a) To verify oil level in the multiplier operate as follows: Put the multiplier in vertical position then verify oil level through the spy “B”.
  • Page 13: Greasing

    REASING All greasing points are equipped with HYDRAULIC TYPE MODEL “A” UNI 7663 greaser fitting. To grease use only MULTIFUNCTIONAL GREASE LITHIUM BASED Type NLGI 2. RES15-20-30 : refer to the drawing which shows the 20 greasing points: the 2 points "X," one for each stabilizer, are accessible by removing the two covers “B”, the other 18 points, “Y,”...
  • Page 14: Problem Solving

    PROBLEM SOLVING TROUBLE CAUSE SOLUTION -PTO switched off. -Switch on the PTO. The controls don’t work -Hydraulic pump broken. -Substitute pump. -Oil lack. -Fill oil tank. -Check oil level in the tank. -Air inside hydraulic The rams move with jerks -Tighten the fittings of the hydraulic lines.
  • Page 15: Transport

    TRANSPORT Except when working, moving the machine takes place when the machine is standing still and the transmission is disconnected. <Important>: keep speed low avoiding holes and ground roughness. <Important>: Before begin the movements always make sure that the safety hooks be in position. <Note when on the road, obey existing traffic laws.
  • Page 16: Work And Maintenance Sheet

    WORK AND MAINTENANCE SHEET Every user should register on this sheet the facts about the life of the machine (both work and maintenance), so as to attest its conditions. DATE HOURS MAINTENANCE NOTE OPERATOR...
  • Page 17 SPARE PARTS & OPTIONS...
  • Page 18: Main Frame Res 10

    MAIN FRAME RES 10...
  • Page 19: Main Frame Res 15-20

    MAIN FRAME RES 15-20...
  • Page 20: Main Frame Res 30

    MAIN FRAME RES 30...
  • Page 21: Rotation Group Res 15-20

    ROTATION GROUP RES 15-20...
  • Page 22: Rotation Group Res 30

    ROTATION GROUP RES 30...
  • Page 23: Arms Res 10

    ARMS RES 10...
  • Page 24: Arms Res 15

    ARMS RES 15...
  • Page 25: Arms Res 20

    ARMS RES 20...
  • Page 26: Arms Res 30

    ARMS RES 30...
  • Page 27: Hydraulic System Res 10

    HYDRAULIC SYSTEM RES 10...
  • Page 28: Hydraulic System Res 15

    HYDRAULIC SYSTEM RES 15...
  • Page 29: Hydraulic System Res 20

    HYDRAULIC SYSTEM RES 20...
  • Page 30: Hydraulic System Res 30

    HYDRAULIC SYSTEM RES 30...
  • Page 31: Res 50 - Summary Table

    RES 50 – SUMMARY TABLE...
  • Page 32: Res 50 - Table 20

    RES 50 – TABLE 20...
  • Page 33: Res 50 - Table 40

    RES 50 – TABLE 40...
  • Page 34: Res 50 - Table 30

    RES 50 – TABLE 30...
  • Page 35: Res 50 - Table 10

    RES 50 – TABLE 10...
  • Page 36: Res 50 - Table 50

    RES 50 – TABLE 50...
  • Page 37: Res 50 - Table 100

    RES 50 – TABLE 100...
  • Page 38: Table Of Contents

    STORAGE ............................... 15 INFORMATION ON DEMOLITION ......................... 15 WARRANTY ..............................15 WORK AND MAINTENANCE SHEET ......................16 MAIN FRAME RES 10 ............................ 18 MAIN FRAME RES 15-20 ..........................19 MAIN FRAME RES 30 ............................ 20 ROTATION GROUP RES 15-20 ........................21 ROTATION GROUP RES 30 ..........................
  • Page 39 HYDRAULIC SYSTEM RES 15 ........................28 HYDRAULIC SYSTEM RES 20 ........................29 HYDRAULIC SYSTEM RES 30 ........................30 RES 50 – SUMMARY TABLE ......................... 31 RES 50 – TABLE 20 ............................32 RES 50 – TABLE 40 ............................33 RES 50 – TABLE 30 ............................34 RES 50 –...

This manual is also suitable for:

Res 15Res 20Res 30Res 50

Table of Contents