MAC PARA Aegis SQ Operating & Packing Instruction

MAC PARA Aegis SQ Operating & Packing Instruction

Emergency system

Advertisement

Quick Links

1

Advertisement

Table of Contents
loading

Summary of Contents for MAC PARA Aegis SQ

  • Page 2: Table Of Contents

    Contents MAC PARA COMMUNITY ...................2 01. FORWORD ......................3 02. INTRODUCTION ....................4 03. RESCUE CANOPY AEGIS SQ................5 04. SPECIFICATIONS ....................8 05. THROWING THE AEGIS SQ.................9 06. MAINTENANCE AND INSPECTION ..............11 07. ATTACHMENT TO THE HARNESS ..............12 08. PACKING INTERVALL ..................12 09. PACKING MANUAL.....................12 10.
  • Page 3: Forword

    For this reason, we recommend intense workout for the use of the Aegis SQ. A perfect way for those who can learn only by themselves by repeating the exercises in the event of an emergency in the prevailing difficult condition and react correctly.
  • Page 4: Introduction

    The Aegis SQ is not suitable for speeds in excess of 32 m/s or 115 km/h. The parachute, the suspension lines and their connection are not designed for an abrupt opening, because the necessary shock absorbers are missing.
  • Page 5: Rescue Canopy Aegis Sq

    Through to intensive development work, we have succeeded to develop a square canopy for the paragliding sport. The Aegis SQ is easy to pack, with a small size and weight and has very high pendulum stability. Despite a high maximum towing capacity, we were able to achieve very good sink rate.
  • Page 6 The operation manual is available for download at www.MAC PARA.com 3.4 Quality assurance The MAC PARA rescue devices go through a step by step control during the whole production. After every step, the product is accurately checked and only after a successful pass of the test the following step will be started.
  • Page 7 Innercontainer 3.7 Certification The rescue system Aegis SQ by MAC PARA is certified EN and LTF to the EN 12491:2001 and LTF 91/09 standards. The approval is valid only in use with the original MAC PARA Tube or 4-Leaf innercontainer. Use of any other inner container may produce different results, including failures.
  • Page 8: Specifications

    04. SPECIFICATIONS Aegis SQ 105 Aegis SQ 140 Min. Load [kg] 65 kg 85 kg Max. Load [kg] 105 kg 140 kg Number of panels Weight of the parachute [kg] 1,45 kg 1,95 kg Surface [m²] 34,5 m² 44 m²...
  • Page 9: Throwing The Aegis Sq

    4.3 The scissors position The Aegis SQ is extremely pendulum stable as a square canopy can be. Nevertheless, the danger of a scissor position (Down Plane) should be reduced by stabilizing the paraglider or its retraction.
  • Page 10 It is important to note the following when landing on the rescue:  Upright pilot position  Legs together and knees slightly bent  be ready to roll over yourself 4.5 Potential errors and hazards Error in the Deployment Rescue response/hazard: Pilot reaction: Release handle Rescue can not be...
  • Page 11: Maintenance And Inspection

    A rescue device exists to save the life of the owner. It needs careful maintenance and care. UV radiation, moisture and chemicals are the worst enemies of your Aegis SQ rescue system. Oils, greases, acids and dyes must not be stored in close proximity to the rescue system.
  • Page 12: Attachment To The Harness

    07. ATTACHMENT TO THE HARNESS The Aegis SQ is only available with the short bridle option. The short bridle option is for harnesses that already have reserve bridles in place. The Aegis SQ must be connected with a carabiner or by looping through the V- line to the harness.
  • Page 13 NOTE: There are 10 panels at the Aegis SQ 105 and 12 panels at the Aegis SQ 140. Now you have to arrange panel by panel to the right (green arrows). The panels should be as wrinkle-free as possible.
  • Page 14 (Aegis SQ 105). NOTE: At the Aegis SQ 105 there are three panels and on the Aegis SQ 140 there are four panels. The following panel and as the same...
  • Page 15 It should be noted that the lines must be located in the centre of the base bellow. Here you a can help yourself with sand bags. NOTE: The Aegis SQ 105 has three panels and the Aegis SQ 140 has four panels.
  • Page 16 NOTE: In the Aegis SQ 105 it is the fourth panel and on the Aegis SQ 140 it is the fifth panel. The other panels are placed clean down till the top corner panel is achieved.
  • Page 17 In the center of the canopy the middle line and the top should be recognizable through the slot. Similar to round canopies the rescue is now folded with the help of S-turns to the width of the inner container. The corner panel is simply folded back to the left side.
  • Page 18 The triangle panel get´s folded to the left on top to reach the inner container width. The Aegis SQ is longitudinal S-folded symmetrically in front of you. The lines are in the middle of the base...
  • Page 19 Otherwise it will prevent the opening of the Aegis SQ! The Aegis SQ should now be placed with narrow S-curves to a tower. The width of the S-turns should be about 11 - 140 cm wide. The length of the S-curves is...
  • Page 20 It is important that the base edge of the Aegis SQ is placed at the top of the 4-leaf container facing towards cover leaf No. 4. The lines are collected in S-folds so that it gives about 2 - 3 line bundles.
  • Page 21 The line bundles are stowed in the pocket of the line bag of the inner container. From the last line groups to the main riser should be left 40 cm of lines for closing the cover part. The leafs 1 - 4 of the inner container will be closed with the black rubber line loop in the correct order.
  • Page 22 (Harness manual). The riser of the Aegis SQ should be connected to the suspension point of the harness. For the connection of the handle there are three loops on the outside face of the inner...
  • Page 23: Release

    08 | 2019 11. CONTENT This release is valid for all MAC PARA Aegis SQ rescues in conjunction with non- original inner containers. WARNING — Use of this parachute with any alternative inner container: the speed of opening and opening shock test has been completed using the inner container supplied.
  • Page 24: Implementation And Installing

    The implementation and installation of a MAC PARA rescue unit in the inner container of a third-party may be made only by trained personal by MAC PARA. During the conversion and installation of the rescue the manual of the rescue as also of the harness - or inside container manufacturer - has to exist and the corresponding installation and pack instructions need to be followed.
  • Page 25: Emergency Opening Report

    EMERGENCY OPENING REPORT Type of Parachute:…………………………………………………………………………...…… Glider used:…………………………………………………………………..……….…...…….. Damage to Parachute:………………………………………………..………………………….. Damage to glider:……………………………………………………………..………………….. Date:………………………………………………… Time:……………………….…………….. Conditions:……………………………………………………………………..…………………. ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… Site:………………………………………………………………….………………………….….. Pilot’s qualifications and experience:……………………………………………………….….. ……………………………………………………………………………………………………… Description of incident: ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… ……………………………………………………………………………………………………… Name of the pilot:………………………………………………………………………………... Address:…………………………………………………………………………………………… ………………………………………………………………………………………………………...
  • Page 26: Inspection Certificate

    INSPECTION CERTIFICATE...
  • Page 27: Type Of Rescue System

    TYPE OF RESCUE SYSTEM AEGIS SQ 105 AEGIS SQ 140 Serial number: ……………………………………………... Inspected ________________________________ Inspected and folded by MAC PARA (Max. Pack interval: 12 months) Confirmation by dealer: ________________________________...

This manual is also suitable for:

Aegis sq 105Aegis sq 140

Table of Contents