Summary of Contents for Englefield Sapphire Series
Page 1
SAPPHIRE ANGLE CORNER SHOWER INSTALLATION GUIDE IMPORTANT READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION SHOWER WALL TOP RAIL RETURN PANEL CORNER POST DOOR ASSEMBLY RETURN RETAINER DOOR SILL SHOWER TRAY INSTALLATION INSTRUCTIONS INSTALLATION KIT • Suitable for installation with Duracryl Wall lining. Sealant required to complete this installation.
Page 2
® DRILLING AND CUTTING DURACRYL TOOLS REQUIRED DRILLING: Small holes can be drilled with a twist drill, but the cutting edge MUST be backed off with an oil stone (the • Tape Measure sharp edge dulled). Large holes must be drilled with a hole •...
Page 3
Move 45º Corner Posts and Using spirit level, plumb Return Panel Assemblies out Door, Return panels and to allow Door Assembly to be Corner Posts. Tape into posi- fitted. tion as shown. Check Door opens and shuts properly and the black lines on the Return assembly top and bottom rails remain hidden.
Page 4
Remove screws from Position Return Panel PVC gasket by pushing outside corner of door at each 45 leg into both Wall Retainer and post in turn and fit corner brack- Corner Post. It should ‘snap’ into ets. Fit screw into top of Return place.
Page 5
PART TWO Seal full height the joint To a height of 100mm, seal between the Walls and the joints between Door Frame & SEALANT APPLICATION Wall Retainers. Corner Post and Door Frame & Wall Retainer. Ensure all joints are clean and dry before applying sealant.
Page 6
CALL US FOR HELP NEW ZEALAND AUSTRALIA KOHLER NZ Ltd. KOHLER Co. 133 Diana Drive, Unit 10, 70-99 St. Hilliers Road, Glenfield, Auburn, Auckland. Sydney. NSW 2144. Ph (09) 980 6800 Ph (02) 9714 3900 Fax (09) 980 6899 Fax (02) 9714 3966 info@kohler.co.nz info@kohler.com.au www.kohler.co.nz...
Need help?
Do you have a question about the Sapphire Series and is the answer not in the manual?
Questions and answers