Download Print this page

Sealey TS01 First Start-Up Quick Start Manual page 2

Sheet metal folder vice / bench

Advertisement

4.7.
Ensure that there is even pressure on both ends.
4.8.
Raise the top folding plate (fig.1.3) buy lifting handles to create the fold. From this test, you will be able to determine how and where
the fold appears.
4.9.
When satisfied with the test results, proceed with the actual workpiece.
4.10.
By rotating the end clamps through the vertical axis, longer lengths of metel sheet can be folded , ie fold a section, unclamp, move
sheet, reclamp, fold second section etc.
Please log on to www.sealey.co.uk, email sales@sealey.co.uk or telephone 01284 757500.
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
Parts support is available for this product.
01284 703534
sales@sealey.co.uk
Original Language Version
www.sealey.co.uk
TS01
|
Issue2
(2,F)
13/07/18

Advertisement

loading