Do you have a question about the ICPMS and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Shimadzu ICPMS
Page 1
2. Shut down the plasma by clicking the Plasma Off button in LabSolutions ICPMS software at the bottom-left of the screen. Wait for the shutdown sequence to complete. 3. Release tension on the peristaltic pump tubing by releasing the guide arms and detaching tubing from the tube hangers.
Page 2
Shut off Chiller. 7. Shut down the LabSolutions ICPMS software and the control computer. 8. Shut off power to the ICPMS, autosampler, and other external accessories. 9. Turn off external roughing pump.
Page 3
Shimadzu Scientific Instruments, 7102 Riverwood Drive, Columbia, MD 21046 Tel: 800.477.1227/410.381.1227; Fax: 410.381.1222; www.ssi.shimadzu.com 11. For Shutdown periods longer than two months, follow also the instructions in the user manual (PN 305-34411, “ICPMS-2030 Instruction Manual”): Page 3 of 4...
Page 4
450 kPa ±10kPa, helium at 150 kPa ±20 kPa. 6. Turn on the power switch on the left side of the main ICPMS-2030 body. 7. Turn on the PC and other peripherals. Open software to establish communications.
Need help?
Do you have a question about the ICPMS and is the answer not in the manual?
Questions and answers