Download Print this page

Mercia Garden Products 0628WKNE0405LBDD2SW-V1 Instructions Manual

28mm log cabin, workshop, no extras, 4x5, ledged braced double doors, two short windows

Advertisement

Quick Links

General Instructions
0628WKNE0405LBDD2SW-V1
28MM LOG CABIN, WORKSHOP, NO EXTRAS, 4X5, LEDGED BRACED DOUBLE DOORS, TWO SHORT WINDOWS
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
measuring tape.
length
head
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628WKNE0405LBDD2SW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628WKNE0405LBDD2SW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0628WKNE0405LBDD2SW-V1 Please retain product label and instructions for future reference Double Door Contents Overall Dimensions: Width = 4110mm Depth = 5036mm Height = 2734mm Base Dimensions: Width = 3808mm Depth = 4808mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Main Building Contents Fascia - 120x16x2118mm QTY 4 S16120-G-2118 (1X14° CUT) Eaves Frame - 27x44x2502mm QTY 4 F2744-2502 Gable - 4000mm QTY 2 AI-0628WKNE0405LBDD2SW-G-V1 Log Board - 120x28x4000mm QTY 1 LB28-AD-4000 Starter Board - 66x28x4000mm QTY 2 LB28RT66-A-4000 Log Board - 110x28x5000mm QTY 1...
  • Page 4 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 2 Pre-assembly Parts needed- No. 31 QTY 11 *Please note: Following the same method Each board interlocks at arrange the remaining framing (No. 31) inside the assembled either end in a staggered pattern.
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 4 Step 5 Parts Needed - No. 23 QTY 2 Parts Needed - No. 24 QTY 6 No. 27 QTY 2 No. 26 QTY 6 No.
  • Page 6 Please retain product label and instructions for future reference Step 6 IMPORTANT : Pre-drill before xing screws. Step 7 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 12 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 8 Step 9 Parts Needed - No. 24 QTY 6 Once you have laid 6 log boards (on top of the No. 25 QTY 6 starter board) up the door section, slide the No.
  • Page 8 Please retain product label and instructions for future reference IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Step 10 Step 11 Parts Needed - No. 2 QTY 2 Parts Needed - No. 1 QTY 2 No. 3 QTY 2 No.
  • Page 9 Please retain product label and instructions for future reference Step 13 Step 14 Parts Needed - No. 24 QTY 6 Parts Needed - No. 24 QTY 1 No. 29 QTY 1 No. 25 QTY 6 No. 26 QTY 12 No. 36 QTY 1 No.
  • Page 10 Please retain product label and instructions for future reference Step 15 IMPORTANT: Pre-drill before xing screws. Step 16 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 22 QTY 2 Parts needed - No. 30 QTY 3 Place the gable tops (No. 22) Align the Roof Purlins (No.
  • Page 11 Please retain product label and instructions for future reference Step 17 IMPORTANT: Pre-drill before xing screws. Step 18 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 40 QTY 92 Parts Needed - No. 35 QTY 4 Place the rst two roof Ensuring the roof boards are ush board’s (No.
  • Page 12 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 19 Step 20 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 39 QTY 44 Parts needed - No. 33 QTY 8 Roof Roof Place the rst oor board (No. 39) Inside the building place the closure trim (No.
  • Page 13 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 22 Step 23 Parts needed - No. 42 Parts Needed - No. 34 QTY 4 Cut the felt (No. 42) into ve strips and Align the fascia’s (No. 34) with lay onto the roof in the order shown the roof and x into place in the illustration.
  • Page 14 Please retain product label and instructions for future reference Step 24 Step 25 Parts needed - No. 41 QTY 8 Lift each door onto the Arrange the storm braces (No.41) already existing hooks on the around the building (internally). Garage door frame, ensuring Place 2x storm braces per side the hook and bands connect.
  • Page 15 Please retain product label and instructions for future reference Step 27 IMPORTANT : Pre-drill before xing screws. Step 26 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 15 QTY 1 Parts Needed - No. 18 QTY 2 No. 21 QTY 2 No.
  • Page 16 Please retain product label and instructions for future reference Step 28 Step 30 Parts Needed: No. 6 QTY 1 Lift each window onto the already existing No. 16 QTY 1 hooks on the window frame, ensuring the hook and bands connect. Attach the Rain Guard (No.