Download Print this page

Norfolk Greenhouses Highclere 10x10 Assembly

Advertisement

Quick Links

TOOLS REQUIRED
Gloves
Step Ladder
Sand Paper
Battery-Powered Drill / Screwdriver
8mm Drill Bit
Pencil
Tape Measure
Sharp Knife
Hammer / Mallet
IMPORTANT!
PLEASE READ PRIOR TO ASSEMBLY OF
THE BUILDING
EVERY PRECAUTION IS TAKEN TO
ENSURE THAT YOUR BUILDING HAS NO
ELEMENT INCORRECTLY PLACED OR
POSSIBLY HAZARDOUS, HOWEVER
PRIOR TO USE PLEASE CHECK ALL
SURFACES FOR THE FOLLOWING:
1 RAISED GRAIN, SPLINTERS: sand
down timber to smooth finish
2 NAIL/SCREW/PIN HEADS PROUD: tap
home to be flush with surface of timber
3 DAMAGED SCREW HEADS
RESULTING IN SHARP SPLINTERS OF
METAL: replace
4 SHARP ENDS OF NAILS/ SCREWS/
PINS PROTRUDING THROUGH THE
PANEL: remove and reposition.
5 ENSURE ALL PARTS ARE SECURED
AGAINST REASONABLE FORCE:
remove and refit
6 ENSURE THERE ARE NO LOOSE
PARTS: remove and refit/discard
We recommend that protective
gloves be worn throughout
PLEASE NOTE
Wood is a natural product and is therefore
prone to changes in appearance, including
some warping, movement and splitting,
particularly during unusual climatic conditions
(long hot or wet spells of weather). As a natural
occurrence this is not covered by a guarantee.
Assembly of 10x10 Highclere
Thank you and congratulations on the purchase of your Shire garden building.
We believe that this product will give you many years of excellent service. This
is a natural product manufactured to a high standard therefore if you have any
queries or experience any difficulties then please contact our customer service
hotline on 01945 465 295. Normal office hours: 8.30 am to 5.00 pm Monday to
Friday.
Preparation of base
We recommend that the base onto which your building will stand should be at least
75mm larger in each direction than the total floor size of the building.
Actual floor area of the building: 3068x2990 (10'1"x9'10")
Total height clearance: 2250mm
The chosen position in your garden for the siting of the building should be
excavated to a depth of 75mm to allow a base of sand, on to which paving slabs
can be evenly laid - THEY MUST BE LEVEL AND FIRM.
Treatment/care of your Garden Building
Treat with a suitable decorative wood finish immediately. We recommend that all
timber pieces be treated again prior to assembly and again within 3 months of
assembly. We further recommend that all pieces are treated again at least annually
or as frequently as the instructions on the product used recommends.
We would suggest that all wall panels be treated in an upside-down position to
allow the finish/treatment to ingress into the tongue and groove jointing.
We would also remind you that you would rarely (if ever) be able to re-treat the
underside of the floor following assembly. We strongly recommend that the
underside of the floor is treated an absolute minimum of twice (not including
pre-treatment).
Garden buildings are not waterproof, therefore on assembling building we
recommend using a silicon based sealant between wall panels and between
wall panels and floor.
QTY
DESCRIPTION
6
Glazing Panes 550x1535mm
12 Beading 551 mm
12 Beading 1535 mm
2
Fascia Sides114x12x3070mm
2
Fascia Sides114x12x520mm
2
Fascia Front 114x12x1620mm
EXTERNAL VIEW OF PANELS
1
Fascia Front 114x12x150mm
4
Cover Strip 56x12x2090mm
3
Cover Strip 56x12x1824mm
1
Set lever handles
66
80mm screws
48
40mm nails
240
Felt nails
Parts
100 15mm panel pins
4
Felt Strips 3.3mtr x 1mtr

Advertisement

loading

Summary of Contents for Norfolk Greenhouses Highclere 10x10

  • Page 1 Assembly of 10x10 Highclere Thank you and congratulations on the purchase of your Shire garden building. We believe that this product will give you many years of excellent service. This is a natural product manufactured to a high standard therefore if you have any queries or experience any difficulties then please contact our customer service hotline on 01945 465 295.
  • Page 2 work on both panels and join the back panel to the side panel by screwing through the pre- 1. Pre-drill through the rear framework of the A Floor & Walls drilled holes using 3 x 80 mm screws. roof overhang panel (the framework that now should sit adjacent to the front of the building) NOTE: For the majority of the assembly of 8.
  • Page 3 the fascia board is flush with the felted face along the front of the overhang panel. Secure C Felt Roof D Cover strips by nailing through into the roof panel frame- work using 2 x 40 mm nails per piece. 1.