GB RKB Series Installation, Operation And Maintenance Manual

50% efficiency air to air

Advertisement

Quick Links

I
N
S
T
A
L
I
N
S
T
A
L
M
A
I
N
T
E
M
A
I
N
T
E
50% EFFICIENCY AIR TO AIR HEAT RECOVERY
MIUM0001_REV01_ RKB_20140130 MIUM ENG.docx
L
A
T
I
O
N
L
A
T
I
O
N
N
A
N
C
E
N
A
N
C
E
SERIES RKB
,
O
P
E
R
A
,
O
P
E
R
M
A
N
U
A
M
A
N
U
A
UNIT
T
I
O
N
A
A
T
I
O
N
A
L
L
N
D
N
D
1

Advertisement

Table of Contents
loading

Summary of Contents for GB RKB Series

  • Page 1 50% EFFICIENCY AIR TO AIR HEAT RECOVERY UNIT SERIES RKB MIUM0001_REV01_ RKB_20140130 MIUM ENG.docx...
  • Page 2: Declaration Of Conformity

    The Legal Representative of LMF S.p.A., located in Meledo di Sarego, via Paradiso 33 (Vicenza- ITALY), declares that the unit belonging to RKB series complies to the prescriptions of the Machine Directive 2006/42/CE, Low Voltage Directive 2006/95/CE, EMC Directive 2004/108/CE and Ecodesign Directive 2009/125/CE.
  • Page 3 SYMBOLOGY ATTENTION DANGER HIGH RISK OF ELECTRIC SHOCK ATTENTION: AUTHORIZED PERSONNEL ONLY 1 – I NTRODUCTION pag. 4 2 - D IMENSIONS AND EIGHTS pag. 5 3 – I NSTALLATION ONFIGURATIONS pag. 6 4 – T RANSPORTATION pag. 7 5 – I &...
  • Page 4 1 - I NTRODUCTION Dear Customer, these heat recovery units are designed and developed for residential and commercial applications and allow the room air renewal with a sure energy saving. Unit must be used only for this purpose, LMF will not respond in case of different use of the unit.
  • Page 5: Dimensions And Weights

    2 – D IMENSIONS AND EIGHTS Packing dimensions The following table, referred to the figure, shows the characteristic dimensions of the horizontal series RKB. M = Supply, E = Exhaust, R = Return A = Fresh air 1000 2000 3000 4000 A (mm) 1000...
  • Page 6: Installation Configurations

    3 – I NSTALLATION ONFIGURATIONS Possible positioning According to the air duct layout, it is possible to rotate adequately the RKB unit air inlets and outlets to give the following combinations, each of them is a specific unit orientation to be specified when ordering. Horizontal configuration RKB Configurations shown on the figure below are possible.
  • Page 7 Thanks to the double drain pan type “A” and type “B” can easily exchangeable on site, no modification has to be done. To modify the position of the each inlet/outlet panels (for example from “E” to “E90”you may need to exchange two panels between each other.
  • Page 8: Transportation , Handling And Storage

    4 – T RANSPORTATION ANDLING AND TORAGE Packaging Each unit is put on bench and protected with cellophane film; the protection must remain intact until the moment of installation. The materials that are not mounted for technical motives are supplied in fitted packing fixed externally or internally to the unit.
  • Page 9: Installation And Connections

    • Do not stack the units • Maximum temperature = 60°C • Minimum temperature = -20°C The Manufacturer declines any responsibility for any damage as a result of negligence or lack of protection from atmospheric agents. 5 – I & C NSTALLATION ONNECTIONS Definitions...
  • Page 10: Machine Positioning

    Choosing place of installation  Position the unit on a solid structure, that will not vibrate, and is capable supporting the weight of the machine.  Position the unit in a point where the condensation discharge may occur easily.  Do not position the unit in an area in which flammable gases, acidic or corrosive substances are present.
  • Page 11: Air Duct Connections

    Air duct connections IMPORTANT: IT IS IMPORTANT NOT TO PLACE IN OPERATION THE UNIT IF THE FAN OUTLETS ARE NOT DUCTED OR NOT PROTECTED BY A SAFETY NET ACCORDING TO THE ACTAUL REGULATION.  The ducts must be the correct dimension based on the functions of system and the air diffusion characteristics of the unit fans.
  • Page 12: Electrical Connections

    Electrical connections Before starting any operation, insure that the general power supply has been isolated. All the electrical connections must be protected at the source by the installer.  Qualified personnel according to the supplied schemes must carry out the electrical connections at the control panel.
  • Page 13: Troubleshooting

    Monthly maintenance Air filters Filter section can be entered through bottom panel; dismounting it the filter can be extracted. For the cleaning, utilize a vacuum cleaner or wash with normal detergent and warm water, allow to dry well. Remember to assemble the filter before operating the unit; replace a new filter after max 3 cleaning cycles. In case of soft bag filter (option), replace it when dirty.

This manual is also suitable for:

Rkb 500Rkb 1000Rkb 2000Rkb 3000Rkb 4000

Table of Contents