Post Service Test Procedure
The following test must be carried out on completion of the RAM change process to
ensure the earth continuity is maintained after servicing.
This process is required to be completed if at any stage the bottom cover has been
removed from the ActivTable.
Set the meter to Ohms
•
(Ω)
Verify resistance of the
•
leads on the meter and
record result
(In this example, the meter
recorded 0.2 Ohm.)
1
2
ActivTable RAM Replacement Guide
7
Need help?
Do you have a question about the ActivTable and is the answer not in the manual?
Questions and answers