Download Print this page

OBO Bettermann isFang 3B-G1 Mounting Instructions page 2

Threaded rod

Advertisement

Available languages

Available languages

Mounting instructions, concrete plinth
1. Make available
Threaded rod
isFang 3B-G1 (5408971) for 1 FangFix
stone
isFang 3B-G2 (5408972) for 2 FangFix
stones
isFang 3B-G3 (5408973) for 3 FangFix
stones
FangFix stone
F-FIX-S16 (5403227)
Edge protection
Mounting instructions, interception rod stand
1. Make available
Use gloves to avoid injury.
Make the prefabricated concrete plinth and
interception rod stand (type isFang 3B-...).
4. Compensation for roof slant
Using a spirit level, compensate the tripod
stand according to the roof slope (maximum
5°) and then tighten the lock nuts.
2. Preparation
Remove the plastic bar in the middle of the
edge protection using a side cutter or Ø 20
mm drill and then push the threaded rod
through the opening from beneath.
2. Positioning
Remove the lock nuts on the threaded rods,
then open the interception rod stand and
mount it on the concrete plinth.
5. Fixing
Insert the interception rod into the retaining
unit of the interception rod stand from above
and fix it with a tension clip.
3. Assembly
From above, position the concrete plinth on
the threaded rod and fix it with a lock nut.
3. Higher wind-speed zones
To use the isFang 3b-150 (1.5 m spreading
width) interception rod system in areas with
higher wind speeds, two concrete plinths
must be positioned next to each other at the
foot of the interception rod.
6. Connection
Incl. Rd 8−10 crossbar to fasten the round
cable to the interception rod.
OBO Bettermann GmbH & Co. KG
Kundenservice Deutschland
Postfach 1120
Tel.: 0 23 73/89-15 00
D-58694 Menden
Fax: 0 23 73/89-77 77
www.obo.de
E-Mail: info@obo.de

Advertisement

loading

This manual is also suitable for:

Isfang 3b-g2Isfang 3b-g3540897154089725408973