Advertisement

Quick Links

Rigging Manual
AERO-40A
El colgado del equipo sólo debe realizarse
utilizando los herrajes de colgado
recomendados y por personal cualificado.
No cuelgue la caja de las asas.
The appliance should be flown only from
the rigging points and by qualified
personnel. Do not suspend the box from
the handles.

Advertisement

Table of Contents
loading

Summary of Contents for D.A.S. Aero Series

  • Page 1 Rigging Manual AERO-40A El colgado del equipo sólo debe realizarse utilizando los herrajes de colgado recomendados y por personal cualificado. No cuelgue la caja de las asas. The appliance should be flown only from the rigging points and by qualified personnel.
  • Page 2: Table Of Contents

    29 - 32 ANNEX I : Tools for rigging systems ANNEX II : Maximum load capacity for AX-AE40S3 34 - 35 36 - 38 ANNEX III : Advice for EASE Focus 2 use Manual de Colgado / aero series / Rigging Manual...
  • Page 3: Rigging System: Precautions

    Do not fly enclosures from unsafe structures. Consult a certified professional if needed. flying accessories that supplied by DAS Audio are the user´s responsibility. Use at your own risk. Manual de Colgado / aero series / Rigging Manual...
  • Page 4: Units Mounting On A Pl-40S

    PL-40S platform side. Rear part of the Front part of the PL-40S platform. PL-40S platform. Side view of the PL-40S platform. Security pins of the PL-40S platform. Front view of the PL-40S platform. Manual de Colgado / aero series / Rigging Manual...
  • Page 5 Check that the four security pins are well positioned. Rear security pins: REAR LINK Front security pin: FRONT LINK (Remember: 0º) Front security pin: FRONT LINK Final mounting of one enclosure on a PL-40S platform. Manual de Colgado / aero series / Rigging Manual...
  • Page 6 The result, platform included, can be seen in Security pins the figures below. Figure of the enclosure on the platform PL-40S with the rods ready to add another enclosure over it. Manual de Colgado / aero series / Rigging Manual...
  • Page 7 Warning: For transport, introduce the pin in hole 0º at “Rear Link”. Check that the four security pins are well positioned. Figures show final mounting of two enclosures on a PL-40S platform (side views). Manual de Colgado / aero series / Rigging Manual...
  • Page 8 Repeat the process described before. Warning: For transport, introduce the pin in hole0º at “Rear Link”. Check that the four security pins are well positioned. You can see the final result in the next figure. Manual de Colgado / aero series / Rigging Manual...
  • Page 9 0º at “Rear Link”. Never carry more than four enclosures on the platform. Check that the four security pins are well positionated. You can see the result in the next figure. Manual de Colgado / aero series / Rigging Manual...
  • Page 10: Array Mounting Of Groups Of 4 Units On A Pl-40S

    AE40S3 introducing the security pin like in the figure below. Check that the security pins are well positioned because they will support the weight of the rest of the enclosures. DETAIL RESULT Manual de Colgado / aero series / Rigging Manual...
  • Page 11 If we use two lift motors, we will use a second PICKUP-AX-AE40S3 which joins through the same way to the pinpoint marked by Ease Focus. Check that security pins well positioned. DETAIL RESULT Manual de Colgado / aero series / Rigging Manual...
  • Page 12 At last, hook the lift motor. In case two lift motors are needed, hook each one to each PICKUP-AX-AE40S3. Like in every security operation, use adecuate security elements. Manual de Colgado / aero series / Rigging Manual...
  • Page 13 1.- Take out the security pin “REAR LINK” of the first enclosure. DETAIL 2 . - S l i g h t l y elevate lift motor to free the rod. Manual de Colgado / aero series / Rigging Manual...
  • Page 14 “FIX DETAIL ANGLE”to fix it (2º in this example). DETAIL 4.- Lower carefully and introduce the security pin in “REAR LINK” and the enclosures will be joined again. Manual de Colgado / aero series / Rigging Manual...
  • Page 15 0º, 0,5º, 1 y 1,5º. After assigning the angles to the enclosures remove the platform to add more enclosures. Remove the security pins and lift the group to add another group of enclosures. DETAIL Manual de Colgado / aero series / Rigging Manual...
  • Page 16 After repeating the process this will be the result of this example, once the platform is removed. 0º 0,5º 1º 1,5º Manual de Colgado / aero series / Rigging Manual...
  • Page 17 FRONT LINK. Enclosure 6 Enclosure 7 Enclosure 8 4.- Place the top group of 4 cabinets over the bottom group. Finally, introduce the security pins in REAR LINK of enclosure 4. Manual de Colgado / aero series / Rigging Manual...
  • Page 18 When the new group is joined to the top group assign the angles following the Ease Focus instructions. The assignment of the angles and to remove the platform is the same as described before with the first group. Manual de Colgado / aero series / Rigging Manual...
  • Page 19 Here you can see the final result for this example with 8 enclosures. 0º 0.5º 1º 1.5º 2º 4º 6º 7º Manual de Colgado / aero series / Rigging Manual...
  • Page 20: Array Disassembly Of Groups Of 4 Units On A Pl-40S

    In this section you will see how to disassemble an array of 4 units. Firstly, go down the array and align with the PL- 40S platform as the figures show. Manual de Colgado / aero series / Rigging Manual...
  • Page 21 Use security gloves and take care with the hands. Use the side pins to fix the plate. At last, introduce the security pins in “REAR LINK.” Figure (5). Manual de Colgado / aero series / Rigging Manual...
  • Page 22 (as you see in the right figure). The control will come back automatically to its position. Similarly, we proceed to remove the rest of the groups and, at last, remove the AX. Manual de Colgado / aero series / Rigging Manual...
  • Page 23: Array Mounting Of Individual Units

    In this case, the units will rest over the front platform, PL-40, while we join them. Add the second enclosure at the desired angle. (for example, 3º). Just introduce the security pin in FRONT LINK to join them. Manual de Colgado / aero series / Rigging Manual...
  • Page 24 Repeat the process with the rest of the enclosures. In this example, we have six enclosures with the following angles: 3º for second 4º for third 5º for fourth 6º for fifth and 7º for sixth Manual de Colgado / aero series / Rigging Manual...
  • Page 25 Make sure the security pins are well placed. 0º 3º 4º 5º 6º 7º Join the lift motor with AX-AE40S3. You will need another PICKUP-AX- AE40S3 if another lift motor is used. Manual de Colgado / aero series / Rigging Manual...
  • Page 26 Place the AX-AE40S3 and join it (with the security pins) to the side pieces of the AX (mounted before). After checking that security pins are well placed, start to lift up the array system slowly. Manual de Colgado / aero series / Rigging Manual...
  • Page 27 While you lift the array, introduce the security pins in REAR LINK while the holes are aligned at the desired angles. Do this from the first to the last enclosure. DETAIL Manual de Colgado / aero series / Rigging Manual...
  • Page 28 While the enclosures lift from the floor, remove the front PL-40 acting over the handles. disassembling follow instructions described earlier but in a reverse way. Manual de Colgado / aero series / Rigging Manual...
  • Page 29: Transporting

    TRANSPORTING This section describes aero unit transport recommendations. We will start with two examples of configurations and we will recommend different ways of loading them inside a truck. Manual de Colgado / aero series / Rigging Manual...
  • Page 30 4 x aero40 4 x aero40 UX-218A 4 x aero40 4 x aero40 UX-218A UX-218A UX-218A UX-218A 4 x aero40 UX-218A UX-218A 4 x aero40 4 x aero40 UX-218A UX-218A 4 x aero40 Manual de Colgado / aero series / Rigging Manual...
  • Page 31 Here is the second example: Manual de Colgado / aero series / Rigging Manual...
  • Page 32 2 x UX-221A 2 x UX-221A 2 x UX-221A 2 x UX-221A 2 x UX-221A 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 4 x aero40 Manual de Colgado / aero series / Rigging Manual...
  • Page 33: Annex I : Tools For Rigging Systems

    Annex I - Tools for rigging systems For best results hanging aero series 2 systems, it is mandatory the use of Ease Focus 2 simulation software which can be downloaded for free from our website www.dasaudio.com within the support section. The download file contains the software and data files with gll files for acoustic systems.
  • Page 34: Annex Ii- Maximum Load Capacity For Ax-Ae40S3

    The loading limitations are displayed by the software and depend on the vertical axis that position the center of gravity. Manual de Colgado / aero series / Rigging Manual...
  • Page 35 (see above panel drawing AX- AE40S3). 17 AERO-40A units - As the axis of the vertical center of gravity coincides with the point 14, we can fly 17 units with that configuration. Manual de Colgado / aero series / Rigging Manual...
  • Page 36: Annex Iii : Advice For Ease Focus 2 Use

    Inclining systems forwards (downwards) result in a negative angle ( ). The systems inclined upwards result in a positive angle ( ). Angle criteria of the cluster -5º 6 AERO-40A a -5º +10º 6 AERO-40A a +10º Manual de Colgado / aero series / Rigging Manual...
  • Page 37 The desired angle: View [°] -14° In this case Delta [º] is 0.54 This means that if we hang the system from point 15 we lack tilt up 0.54º to reach the desired -14º. Manual de Colgado / aero series / Rigging Manual...
  • Page 38 (vertical axis of center of gravity) is number 17 and delta is zero. This indicates that if two lift motors are used the system could be angled at -11.32°. Manual de Colgado / aero series / Rigging Manual...
  • Page 39 www.dasaudio.com DAS Audio Group, S.L. DAS Audio of America, INC. DAS Audio Asia PTE. LTD. DAS do Brasil LTDA. C/. Islas Baleares, 24 6900 NW 52th Street 3 Temasek Avenue, Centennial Rua Dos Andradas, 382 SL 46988 Fuente del Jarro Miami, FL.

This manual is also suitable for:

Aero-40a

Table of Contents