Installation & Mounting Instructions; Mounting The Unit - Price FPV Series Manual Installation

Fan powered variable volume terminal units
Table of Contents

Advertisement

Fan Powered Variable Volume Terminal uniTs
INSTALLATION & MOUNTING INSTRUCTIONS

mounting The unit

1.
Use trapeze hangers or optional
hanger brackets (shipped loose)
as illustrated. Hanging rods should
be securely attached to joists
or to mounting anchors which
are properly secured to slab
construction with lugs or poured in
place anchors. Trapeze bars should
be positioned within 3 inches (76
mm) of the discharge end and 2.5
inches (63 mm) of the inlet end to
allow for access panel removal.
2.
Price Fan Powered Terminal Units
are designed to be mounted in the
direction indicated by the Control
Assembly Label found on the
protective shroud.
3.
Do not block the bottom access
panel, maintain clearance for
blower service. Correct installation
of the trapeze bars will not block
access panel removal.
4.
Do not install tight to slab, avoid
contact with other obstacles such
as rigid conduit and sprinkler
piping. This can cause excessive
vibration and noise transmission.
5.
Install the unit in a location that
allows free access to the unit as
well as all control components.
6.
Ensure main power to the
terminal and electric coil has been
disconnected prior to performing
any electrical work or inspection of
the circuitry.
7.
When mounting hanger brackets to
an electric coil, do not use screws
longer than 3/4" (19).
warninG:
Do not tamper with control
components.
oPTional HanGer braCKeTs
oPTional sPrinG HanGer braCKeTs
TraPeZe HanGers
Maintain 8" (0.2m) clearance
from air terminal and/or control
3/4" x 3/4" x 1/8"
(19mm x 19mm x 3.2mm)
Isolation Pads between
Angles
Trapeze and Terminal
DO NOT BLOCK
BOTTOM ACCESS PANEL
NOTE: INSTALL AIR TERMINALS LEVEL WHEN EQUIPPED WITH VELOCITY PRESSURE CONTROLLERS.
priceindustries.com | FAn Powered VArIAbLe VoLume TermInAL unITs - manual
priceindustries.com | FAn Powered VArIAbLe VoLume TermInAL unITs - manual
oPTional sPrinG HanGer braCKeTs
shrouds to support rods
3" (76mm)
or less
ELECTRIC HEAT
5/16" or 3/8" (7.9mm or 9.5 mm)
diameter hanging rods
DO NOT BLOCK
ACCESS TO
CONTROLS
2.5" (63 mm)
or less
Minimum 3 duct diameters
straight duct on inlet
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fev seriesFdv seriesFpv8000

Table of Contents