Tecumseh F27HC Installation, Operation, Service And Maintenance Instructions page 8

Unit coolers for cold rooms
Table of Contents

Advertisement

Units should be mounted flush to a level ceiling panel using 3/8" stainless steel bolts, hangar rods or lag screws.
There is no need to block or pitch the unit to ensure proper condensate drainage if the unit is mounted level.
Seal the gap between the top of the unit and the ceiling with NSF approved sealant to prevent accumulation of dirt and foreign material.
Do not torque / over-tighten the field pipe fitting attached directly to the
drain pan connection! Use a backer wrench on the drain pan fitting and tighten
the attached pipe fitting no more than approx. 1/2 turn beyond hand tight.
UNIT MOUNTING DETAIL
NSF SANITATION
CONDENSATE DRAIN PAN CONNECTION
Apply an approved pipe thread sealant to the threads of the drain pan
fitting before making the field piping connection.
8

Advertisement

Table of Contents
loading

Related Products for Tecumseh F27HC

Table of Contents