Baxi 45 HTE Installation, Operation And Maintenance Manual page 127

Floor standing condensing gas boilers
Table of Contents

Advertisement

Available languages

Available languages

12.2 connecting the pumps
The pumps of the heating system (P1 and P2) have to be connected to boiler terminal block following the wiring
of figure 9, a relay must be wired between the boiler control circuit board and the pumps.
Cover
Terminal Block
Terminal Block
Cover
Terminal Block
Figure 9
IstructIons pErtaInIng to thE InstallEr
912.359.1 - IE
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

65 hte

Table of Contents