Advertisement

Quick Links

sales@artisantg.com
artisantg.com
(217) 352-9330 |
|
Click HERE
Find the Nexcom PEAK8920VL2 at our website:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PEAK8920VL2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nexcom PEAK8920VL2

  • Page 1 (217) 352-9330 | Click HERE Find the Nexcom PEAK8920VL2 at our website:...
  • Page 2 Building the Digital Infrastructure PEAK 8920VL2 User Manual Version 1.01 Nov 29, 2006...
  • Page 3: Copyright Notice

    Intel and Pentium are trademarks of Intel Corporation. Microsoft Windows® is a registered trademark of Microsoft Corp. All other product names or trademarks are properties of their respec- tive owners. PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 4: Declaration Of Conformity

    4. Use the correct screws and do not overly tighten them. 5. Keep the original packaging and static-protective bag in case the unit has to be returned. Table of Contents Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 5: Nexcom Rma Policy

    2.1 Customers shall enclose the “NEXCOM RMA Service Form” with c. Replaced with 3rd party products if needed. the returned packages. d. If RMA goods can not be repaired, NEXCOM will return it to cus- 2.2 Customers must collect all the information about the problems tomer without any charge.
  • Page 6: Global Service Contact Information

    United Kingdom Fax: 86-1 0-5885-1066 NEXCOM UK www.nexcom.cn 10 Vincent Avenue. Crownhill Email: sales@nexcom.cn Milton Keynes, Buckinghamshire MK8 OAB, United Kingdom Tel: 44-1908-218877 Fax: 44-1908-218867 www.nexcomuk.co.uk Email: sales@nexcomuk.co.uk Table of Contents Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 7: Rohs Compliance

    “(LF)” will be added to the compliant product name. NEXCOM RoHS Environmental Policy and Status Update For example, PEAK 7220VL2G RoHS version will become PEAK Nexcom is a global citizen for building the digital infrastructure. We 7220VL2G(LF). are committed to providing green products and services, which are...
  • Page 8: Table Of Contents

    Figure 4-3: BIOS –Chipset Features ..........39 . Power Management Setup/APM ........0 .1 Setting Jumpers ..............1 Figure 4-4: BIOS – Power Management Setup ......40 Table 2-1: Setting Jumpers ............16 Table of Contents Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 9 Table A-2: Control Register Bit Definition ........44 A. Watchdog Timer Programming Procedure ...... Table A-3: WDT Control Register Initial Value ......45 Appendix B GP I/O Programming ........47 Table of Contents Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 10: Chapter 1 Product Introduction

    Chapter 1 Product Introduction PEAK 8920VL2 User Manual...
  • Page 11: Main Feature

    Four USB 2.0 directly output from bracket to save the cabling cost. • Flexible design option for single or dual processors. • Dedicated CPU cooler design for the thermal solution. PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 12: Electrical Specifications

    82573L PCI Express Gigabit Ethernet  ®  1 x 2-pin JST (2.5mm) power connector for DOM (Disk On Module) Support Boot From LAN (PXE)  PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 13: Board Layout

    Operating Temperature: 0°C ~ 60°C (for Board Level Only) Storage Temperature: -20˚C to 85˚C  Relative Humidity:  Operating: 10%~90% (non-condensing) Non-Operating: 5%~95% (non-condensing) Certifications CE approval   FCC Class A PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 14: Board Dimensions

    CE11 C105 C106 R308R309 R313 C109 R310 CE13 0.00 Figure 1.3 Top View of the PEAK 8920VL2 Figure 1.4 CPU Board Dimensions of the PEAK 8920VL2 PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 15: Ordering Information

    CE11 C224 C225 CT10 6.21 R396 C227 C228 C216 C197 R397 C226 C200 R398 C229 R395 0.00 Figure 1.5 I/O Board Dimensions of the PEAK 8920VL2 PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 16 Chapter 2 Jumper Setting PEAK 8920VL2 User Manual...
  • Page 17: Chapter 2 Jumper Setting

    JP4:GPIO  Def. Def. Def. Def. Def. Def. SIO_PBIN GPO17 GPO16 GPO15 GPO14 GPI13 GPI12 GPI11 GPI10 JP10:HD LED  JP5:DOM  Def. Def. Def. HD_LED PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 18: Location Of Jumpers

    DIMM 3 DIMM 1 USB_5N USB1 USB_5P Intel 5000P / 5000X USB2 USB_GND USB3 CPU 1 CPU 0 FAN1 FAN2 USB4 JP10 Figure 2-1: Jumper Location PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 19: Pci Routing

    Push button JP10 HDD LED FAN1 CPU0 FAN FAN2 CPU1 FAN CON1 USB1 CON2 USB2 CON3 USB3 CON4 USB4 CON5 CON6 LAN1 CON7 LAN2 CON8 PS2 KB/Mouse PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 20 BOX-2.0mm-M-180 BOX-2.0mm-M-180 Connector pin definition B.Connector pin definition Signal Signal Signal SIO_DCD#2_CON SIO_RX2_CON USB_VCC45 SIO_TX2_CON SIO_DTR#2_CON USB_4N IO_GND SIO_DSR#2_CON USB_4P SIO_RTS#2_CON SIO_CTS#2_CON USB_5N SIO_RI#2_CON USB_5P USB_GND PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 21 IDE_D11 SIO_RTS#1_CON SIO_CTS#1_CON IDE_D3 IDE_D12 SIO_RI#1_CON IDE_D2 IDE_D13 IDE_D1 IDE_D14 IDE_D0 IDE_D15 ESB_IDE_DREQ IDE_IOW# IDE_IOR# ESB_IDE_IORDY IDE_CABLE ESB_IDE_DACK# IDE_IRQ14 ESB_IDE_DA1 IDE_P66DET_R ESB_IDE_DA0 ESB_IDE_DA2 IDE_CS1# IDE_CS3# IDE_LED# PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 22 A.Connector size: 1 X 4 = 4 Pin PIN-2.54mm-M-180 PIN-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal Signal 3.3VSB LAN1_LINK# 3.3VSB LAN1_ACTLED# 3.3VSB LAN2_LINK# 3.3VSB LAN2_ACTLED# IO_SPEAKER PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 23 A.Connector size: 2 X 5 = 10 Pin PIN-2.54mm-M-180 PIN-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal Signal RTCRST# ESB_RTCRST# GPO14 GPI10 CMOS_CLEAR GPO15 GPI11 GPO16 GPI12 GPO17 GPI13 PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 24 A.Connector size: 1 X 2 = 2 Pin A.Connector size: 1 X 5 = 5 Pin PIN-2.54mm-M-180 PIN-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal KBLOCK# PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 25 A.Connector size: 1 X 2 = 2 Pin A.Connector size: 1 X 2 = 2 Pin PIN-2.54mm-M-180 PIN-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal HW_RST# PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 26 A.Connector size: 1 X 2 = 2 Pin A.Connector size: 1 X 2 = 2 Pin JP10 PIN-2.54mm-M-180 PIN-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal ATX5VSB SIO_PBIN HD_LED PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 27 A.Connector size: 1 X 4 = 4 Pin FAN1 FAN2 WAFER-2.54mm-M-180 WAFER-2.54mm-M-180 B.Connector pin definition B.Connector pin definition Signal Signal VCC_12 VCC_12 CPU0_FAN CPU1_FAN CPU0_FANPWM CPU1_FANPWM PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 28 USB-F-90 USB-F-90 B.Connector pin definition B.Connector pin definition Signal Signal USB_VCC0 USB_VCC1 USB_0N USB_1N USB_0P USB_1P USB_GND USB_GND MH1 USB_GND MH1 USB_GND MH2 USB_GND MH2 USB_GND PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 29 B.Connector pin definition DATA- DATA+ Signal USB_VCC2 USB-F-90 USB_2N B.Connector pin definition USB_2P Signal USB_GND USB_VCC3 MH1 USB_GND USB_3N MH2 USB_GND USB_3P USB_GND MH1 USB_GND MH2 USB_GND PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 30 LAN1_M2P VGA_R_CON VGA_G_CON LAN1_M2N LAN1_M1N VGA_B_CON LAN1_M3P LAN1_M3N SGND SGND LAN1_LINK# L1_CONVCC SGND SGND LAN1_ACTLED# L1_CONVCC_2 VGA_VCC SGND LAN_GND LAN_GND VGA_I2CDAT_CON VGA_HSYNC_CON VGA_VSYNC_CON VGA_I2CCLK_CON SGND SGND PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 31 Signal LKB_DAT LMS_DAT Signal Signal K/M_GND LK/M_VCC LAN2_M0P LAN2_M0N LKB_CLK LMS_CLK LAN2_M1P LAN2_M2P K/M_GND K/M_GND LAN2_M2N LAN2_M1N K/M_GND LAN2_M3P LAN2_M3N LAN2_LINK# L2_CONVCC LAN2_ACTLED# L2_CONVCC_2 LAN_GND LAN_GND PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 32: Power Consumption

    2.5 POWER Consumption...
  • Page 33 Chapter 3 Expansion PEAK 8920VL2 User Manual...
  • Page 34: Chapter 3 Expansion

    Table 3-1: DIMM Configurations of the PEAK 8920VL2 notch on the memory align with the memory slot. 2. Press down the memory evenly until the ejectors snap into the lock position. PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 35: Tested Memory Reference List

    CPU 0 USB3 240pins 2GB DDR2 677 FAN1 Tran- FB-DIMM Module TS256MFB72V6J-T 2 GB FAN2 scend USB4 (Reg & ECC & DDR667) JP10 Figure 3-3: Installing CPU PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 36: Cpu Support List

    Chapter 3 Expansion 3.5 CPU support list 3.6 Passive Backplane Support List NEXCOM provides PICMG 1.3 compliant 4U backplanes to fit most Dual-Core Intel Xeon Processor 5100 Series for Dual-Processor Embedded Computing ® ® project needs. The 4U backplanes include two 14-slot NBP 14111,...
  • Page 37 Chapter 4 AMI BIOS Setup PEAK 8920VL2 User Manual...
  • Page 38: Chapter 4 Ami Bios Setup

    Be sure to modified the setting with caution. understand all the Setup options, and select the appropriate settings. Load Failsafe Defaults to restore the manufacture setting. PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 39: The Main Menu

    PRESS <CTRL + ALT + DEL> KEY Press the <Del> key or press the <Ctrl>, <Alt>, and <Esc> keys to enter Setup: Figure 4-1: BIOS Setup Utility Main Menu PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 40: Advanced Bios Features

    Chapter 4 AMI BIOS Setup 4.5 Advanced BIOS Features 4.6 Chipset Features Figure 4-2: BIOS – Advanced BIOS Features Figure 4-3: BIOS –Chipset Features PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 41: Power Management Setup/Apm

    Chapter 4 AMI BIOS Setup 4.7 Power Management Setup/APM 4.8 PnP/PCI Configurations Figure 4-4: BIOS – Power Management Setup Figure 4-5: BIOS – PnP/PCI Configurations PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 42: Advanced Pc Health / Hardware Health Status

    Chapter 4 AMI BIOS Setup 4.9 Advanced PC Health / Hardware Health Status 4.10 Set Password/Security Figure 4-6: Advanced PC Health / Hardware Health Status PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 43: Save & Exit Setup

    Chapter 4 AMI BIOS Setup 4.11 Save & Exit Setup PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 44 Appendix A Watchdog Timer PEAK 8920VL2 User Manual...
  • Page 45: Appendix A Watchdog Timer

    1: Enable watchdog timer 0: Disable watchdog timer 1 sec 2 sec 4 sec 8 sec WDT Active Time 16 sec 32 sec 64 sec 128 sec 255 sec PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 46: Watchdog Timer Programming Procedure

    Table A-3: WDT Control Register Initial Value cates the initial value of WDT (00000000b): Value Mean Disable Watchdog Timer 3, 2, 1, 0 0000 Select 255 second PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 47 WDT Configuration Port. Then WDT will start according to the above settings. dx, F2h ; Setting WDT Configuration Port dx, al ; Output the Control Register Value PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 48: Appendix B Gp I/O Programming

    Appendix B GP I/O Programming PEAK 8920VL2 User Manual...
  • Page 49 2eh, 87h ;When set to a ‘0’, respective GPIO port is programmed as an output port. ;####################################################### ############### ;####################################################### ############### ;Select logical device (GPIO1). ;####################################################### ############### PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...
  • Page 50 ;####################################################### ############### out 2eh, 0f1h out 2fh, 0f0h; pull high GPIO14-17 //###################################################### ################ // Exit Configuration mode. //###################################################### ################ out 2eh, 0aah PEAK 8920VL2 User Manual Copyright © 2006 NEXCOM International Co., LTD. All rights reserved...

Table of Contents