Frost Heave Cabinet
AG250
Impact Test Equipment Ltd
www.impact-test.co.uk - www.impact-test.com
www.impact-testsets.co.uk
User Guide
www.impact-test.com
User Guide
www.impact-test.co.uk
www.impact-testsets.co.uk
www.impact-test.com

Advertisement

loading

Summary of Contents for Impact Test Equipment AG250

  • Page 1 Frost Heave Cabinet AG250 Impact Test Equipment Ltd www.impact-test.co.uk - www.impact-test.com www.impact-testsets.co.uk User Guide www.impact-test.com User Guide www.impact-test.co.uk www.impact-testsets.co.uk www.impact-test.com...
  • Page 2 Impact Test Equipment Ltd. Building 21 Stevenston Ind. Est. Stevenston Ayrshire KA20 3LR T: 01294 602626 F: 01294 461168 E: sales@impact-test.co.uk Test Equipment www.impact-test.co.uk Test Sieves & Accessories www.impact-test.com Test Sets to International Standards www.impact-testsets.co.uk www.impact-test.co.uk www.impact-test.com www.impact-testsets.co.uk...
  • Page 3 This equipment has been designed to meet the requirements of BS 812-124:2009 You will need to have a copy of this standard to refer to. 1. UNPACKING Remove all packing material and place on a flat floor. It is important that the unit is level. Use the self-levelling feet with an accurate spirit level instrument.
  • Page 4 2. MAINS SUPPLY 240-volt units. Each unit comes supplied with a mains connection lead already fitted with a correctly rated fuse. The fuse rating and other details for each unit is shown on the voltage plate riveted to the back of the unit. It is important that, if the fuse needs to be replaced, it must only be replaced with one of the correct rating.
  • Page 5 Position the 5 air probes into the top section of the chamber as per guidance from BS 812-124 Close lid, attached the upper frame and place the level guide rods through the 9 holes in the lid. Connect your external displacement sensors to these guide rods (not supplied) 3.10 Leave the environment to settle as per guidance from BS 812-124 3.11...
  • Page 6 Press Enter Key to go to each value Using the Up, Down, Left, Right keys, change to desired value Press Configure Key to save value Press Up Key to return to main run screen 3.14 To change water temperature set point Press Down button twice to you get to the Configuration Water Temp Screen Repeat above procedures...
  • Page 7 3.15 To change defrost time Defrost time is the time in between each test that the unit requires to perform a defrost. We recommend 3 hours in between each 96 hour test. This can be changes as follows Press Down button 3 times Hold the Config button down for 5 seconds Change values as above and Save with the Configure Button 3.16...
  • Page 8 3.17 Process data (5 air temperatures and 5 water temperatures) are constantly monitored during the test on the recorder. The data views on the screen be changed by pressing the screen and the lower blocks Mode, Menu & Group come on. Press up and down on the Mode to change views from test to graph to all view.
  • Page 9 3.18 At the end of the test, turn the following functions off by pressing the associated keys. Air Cooling, Water Heating, Level Control and Water Pump. If you require to drain the system, ensure the Level Control is turned off and open the manual water valve a shown in image below. 4.