MANUAL SC-TOP Preface Congratulations, you have chosen a Rohde kiln - a high-quality product meeting the highest requirements. This instruction manual will help you to familiarise yourself with your new kiln. Please read the instruction manual carefully before using your kiln for the first time. Make sure you understand the features and functions of the kiln and control unit.
MANUAL SC-TOP Kiln cover joined mortar-free Multistick for controller connection. Pressure spring-supported opening mechanism on cover. Lid safety switch. Solid State Relays Heating elements fixed in exact position. Exhaust air socket Thermocouple installed in a safe position Castors on back legs for easy transport.
Please make sure that you fully understand both the safety instructions and the safety icons before starting to operate the kiln. For your own safety only use original spare parts! Cebex AB does not assume any liability for damage resulting from incorrect or defec- tive heating elements from other manufacturers.
MANUAL SC-TOP 5. START UP Delivery / Unpacking of kiln The Toploader will usually be delivered on a pallet by a freight-forwarding agent. Immediately after delivery check the packaging for any visible damage. Should you detect any damage, unpack the pallet together with the driver and check the goods again for damage.
MANUAL SC-TOP Installation of ventilation system Screw the exhaust air socket (figure 4) into the hole on the left side of the kiln. The opening has been located in a position that will allow fumes and gases to be released through an exhaust air socket (optional accessory).
MANUAL SC-TOP Wall installation for controller G20-20 G20-20 is being delivered with a special wall fixing device. Please follow the manual enclosed with the controller. Kiln and furniture initial firing VARNING: First check that the protective foil has been removed from the entire kiln !! Before starting to use the kiln in every day firing, you must carry out a dry firing.
MANUAL SC-TOP 7.0 Generell firing instructions The controller Please read the controller instruction manual carefully. The kiln is ready for operation after it has been connected to the mains supply and the controller. During the first firing of the kiln we recommend that it is frequently checked. Important about firing •...
MANUAL SC-TOP 8.0 MAINTENANCE / CARE AND CLEANING As the fire bricks give off residual moisture during the first operation the volume of the kiln might change slightly. It is therefore essential to readjust the tensioning belts of the stainless steel casing of the cover (figure 24) and main ring (figure 25) after the first firings (not applicable for Quattro and square or rectangular Toploader models).