Advertisement

Quick Links

MANUAL
SE
DK
EN
Instruction manual
SC-TOP
-Please consider the environment before printing

Advertisement

Table of Contents
loading

Summary of Contents for Cebex SC-TOP Series

  • Page 1 MANUAL Instruction manual SC-TOP -Please consider the environment before printing...
  • Page 2: Table Of Contents

    MANUAL SC-TOP CONTENTS Preface ..................3 The SC-family .
  • Page 3: Preface

    MANUAL SC-TOP Preface Congratulations, you have chosen a Rohde kiln - a high-quality product meeting the highest requirements. This instruction manual will help you to familiarise yourself with your new kiln. Please read the instruction manual carefully before using your kiln for the first time. Make sure you understand the features and functions of the kiln and control unit.
  • Page 4: Overview

    MANUAL SC-TOP Kiln cover joined mortar-free Multistick for controller connection. Pressure spring-supported opening mechanism on cover. Lid safety switch. Solid State Relays Heating elements fixed in exact position. Exhaust air socket Thermocouple installed in a safe position Castors on back legs for easy transport.
  • Page 5: Safety

    Please make sure that you fully understand both the safety instructions and the safety icons before starting to operate the kiln. For your own safety only use original spare parts! Cebex AB does not assume any liability for damage resulting from incorrect or defec- tive heating elements from other manufacturers.
  • Page 6: Start Up

    MANUAL SC-TOP 5. START UP Delivery / Unpacking of kiln The Toploader will usually be delivered on a pallet by a freight-forwarding agent. Immediately after delivery check the packaging for any visible damage. Should you detect any damage, unpack the pallet together with the driver and check the goods again for damage.
  • Page 7: Installation Of Ventilation System

    MANUAL SC-TOP Installation of ventilation system Screw the exhaust air socket (figure 4) into the hole on the left side of the kiln. The opening has been located in a position that will allow fumes and gases to be released through an exhaust air socket (optional accessory).
  • Page 8: Mounting The Controller On The Wall

    MANUAL SC-TOP Wall installation for controller G20-20 G20-20 is being delivered with a special wall fixing device. Please follow the manual enclosed with the controller. Kiln and furniture initial firing VARNING: First check that the protective foil has been removed from the entire kiln !! Before starting to use the kiln in every day firing, you must carry out a dry firing.
  • Page 9: Loading The Kiln

    MANUAL SC-TOP 7.0 Generell firing instructions The controller Please read the controller instruction manual carefully. The kiln is ready for operation after it has been connected to the mains supply and the controller. During the first firing of the kiln we recommend that it is frequently checked. Important about firing •...
  • Page 10: Maintenance / Care And Cleaning

    MANUAL SC-TOP 8.0 MAINTENANCE / CARE AND CLEANING As the fire bricks give off residual moisture during the first operation the volume of the kiln might change slightly. It is therefore essential to readjust the tensioning belts of the stainless steel casing of the cover (figure 24) and main ring (figure 25) after the first firings (not applicable for Quattro and square or rectangular Toploader models).
  • Page 11: Electrical Diagram

    MANUAL SC-TOP SC 65 Main electrical diagram Ver.200319-01...
  • Page 12 MANUAL SC-TOP SC 65 Control electrical diagram Ver.200319-01...
  • Page 13 MANUAL SC-TOP SC 100 Main electrical diagram Ver.200319-01...
  • Page 14 MANUAL SC-TOP SC 100 Control electrical diagram Ver.200319-01...
  • Page 15 MANUAL SC-TOP SC 150 Main electrical diagram Ver.200319-01...
  • Page 16 MANUAL SC-TOP SC 150 Control electrical diagram Ver.200319-01...
  • Page 17 MANUAL SC-TOP SC 200 Main electrical diagram Ver.200319-01...
  • Page 18 MANUAL SC-TOP SC 200 Control electrical diagram Ver.200319-01...
  • Page 19: Spareparts

    MANUAL SC-TOP 11.0 Spareparts SC 65: Item no. Product name Remarks 52VSC065-12 Heating element SC 65 – 1 & 2 1 & 2 are identical 52VSC065-3 Heating element SC 65 – 3 52-SC-KRAMPE Staple/clamp for element fixing All SC-kilns 52PK-1-10 Element clam, 1-pole, 10 mm²...
  • Page 20 Cebex Keramikexperterna AB -Please consider the environment before printing. Erlandsrovägen 3B, S-218 45 Vintrie, Sweden, Tel +46 40 671 77 60 | www.cebex.se | info@cebex.se | www.high-temperaturesolutions.se...

This manual is also suitable for:

Sc 45Sc 65Sc 100Sc 150Sc 190Sc 200

Table of Contents