DUROplastic duolite DAP9 Instruction Manual

DUROplastic duolite DAP9 Instruction Manual

Advertisement

After first Multiwall sheet and brackets
have been secured...
Step 2.2
Head Office - Cape Town
Libra Close , Brackenfell
Tel 021 981 1440
Fax 021 981 1541
Gauteng
Cnr Northway Marlboro Drive
Kelvin , Sandton
Tel 011 804 2804
Fax 011 804 2808
Durban
22 Trotter Road, Pinetown
Tel 031 701 9921
Fax 031 701 6806
For more product information, go to our website:
www.awningsa.co.za
We recommend that you
drill pilot hole into top of
awning bracket, when
connecting 2 or more
awnings together to secure
Multiwall sheet.
George
Cnr Fabriek / Albert Rd
George Industria
Tel 044 873 0508/3
Fax 044 873 0503
Instruction Manual
DAP9
-
DIY Awning

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the duolite DAP9 and is the answer not in the manual?

Questions and answers

Summary of Contents for DUROplastic duolite DAP9

  • Page 1 After first Multiwall sheet and brackets have been secured... We recommend that you drill pilot hole into top of awning bracket, when Step 2.2 connecting 2 or more awnings together to secure Multiwall sheet. Instruction Manual DAP9 DIY Awning Head Office - Cape Town Libra Close , Brackenfell Tel 021 981 1440 Fax 021 981 1541...
  • Page 2 Tools required Steps for installation Slide C- and U-channel onto Duolite sheet. Back U-channel Do not remove Aluminium Foil Tape - it is there to reduce moisture inside flutes In the event of moisture ingress, remove foil and blow clear with hair dryer. Close again with Duck Tape / Foil Tape.

Table of Contents