Page 2
PROALL GUNITE QUICK START GUIDE Preliminary checks: Position aggregate materials to discharge point: 1. Engine is running and PTO engaged (if equipped). 12. Push BELT FORWARD button on the keypad to start the belt 2. Master switch is ON (power to control system).