Advertisement

Quick Links

Brilliantly simple – simply brilliant.
Kanuk® 1 & 2
Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Kanuk 1 and is the answer not in the manual?

Questions and answers

Summary of Contents for EHV Kanuk 1

  • Page 1 Brilliantly simple – simply brilliant. Kanuk® 1 & 2 Manual...
  • Page 2: Table Of Contents

    (chimney) and the heating appliance. This also applies to the case of changes. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 3: Structure And Components Of The Kanuk

    Door locking mechanism Gas flue pipe Butterfly control valve Primary air regulation Supply air controller for secondary air regulation Secondary air regulation Ash catch plate Kanuk® Classic EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 4: Weight

    The side panels will be clipped into the bot- tom hangers. Step II Fix the side panels with the accompanying screws at the top hangers. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 5: Combustion Air Supply

    Flammable floor coverings have to be protected by fire-resistant material. In addition the material needs to be placed also at least 50 cm in front of the stove and 30 cm next to it. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 6: Chimneys

    * maximum quantity of combustible in kg * depending on building structure, insulation, etc. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 7: Directions For Use

    During heating up and use with nominal heat output, the pri- mary and secondary air vent in the rear wall must be opened. The primary air vent (image EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 8: Heating Up

    After the fire is done, the chimney needs to be checked by a specialist, to make sure that there are no damages or leakinesses. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 9: Refilling

    Carry out a cleaning in all cases once during and after the heating period. The sealing cord of the combustion chamber door needs to be replaced in case of damage. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 10: Guarantee Guarantee/Warranty

    Ask your co-contractor for the required form sheet. Only original or spare parts accredited by the manufacturer may be used. Wrong use and inobservance of this manual will abrogate the warranty claim. EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 11 NOTIZEN EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...
  • Page 12 EHV GmbH • Entwicklung | Herstellung | Vertrieb • Hauptstraße 131 • 01744 Dippoldiswalde...

This manual is also suitable for:

Kanuk 2

Table of Contents