Advertisement

Installation and operating manual
Barrier PASS 838

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Pass 838 and is the answer not in the manual?

Questions and answers

Summary of Contents for tousek Pass 838

  • Page 1 Installation and operating manual Barrier PASS 838...
  • Page 2: Maintenance

    • Maintenance works have to be carried out according to our maintenance plan (page12). This manual is the sole property of the TOUSEK Ges.m.b.H. and may not be made available to competitors. All rights reserved. No part of it may be reproduced without our prior written permission.
  • Page 3 All components are built into a robust red finished (on request also silver finished resp. in INOX ), lockable steel housing. In case of a power failure the barrier boom can be opened and closed manually after loosening the emergency release hand wheel. Due to its particularly massive execution and the very short opening and closing times, the Tousek PASS 838 barrier operator has been designed to handle a large number of opening/closing cycles per day. Optional accessories: base plate for barrier operator, (barrier boom) tip rest, base plate for (barrier boom) tip rest., pluggable radio receiver (tousek STN), pluggable induction loop detector (ISD 6) and barrier boom grid.
  • Page 4 (12) Limit bolt „boom CLOSED“ (13) emergency release (14) reduction gearing (15) drive motor (16) electronic control with LC-Display menu programming (16a) Barrier in position „CLOSED“ Barrier in position „OPEN“ - 4 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 5: Installation

    V, which depends on the barrier used (barrier boom): Ø30 For barriers with flat boom: V = 190 For barrier type PASS 838 L6 base plate (= barrier with round boom): V = 220 guide in bracket = barrier width - 25mm 3b.
  • Page 6 • make sure to slide the slide in module (E) for both mounting types (left/right) into the boom so that the dropping (E.S) for the cylinder head bolt turns away from barrier housing.  View S1 - 6 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 7 (example shows boom mounting (boom carrier) of a left barrier)        View S2 (Arrangement of mounting parts for left barrier)   left barrier right barrier - 7 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 8: Important Installation Notes

    • As an additional safety device we recommend the connection of a photocell. Warning • The safety standards and regulations regarding the force adjustment have to be in compliance with the effective rules ! - 8 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 9 • The end position of the barrier must take place according to the above services mentioned above description. • Never use a support fork or pendulum support as a limit. These serve only to discharge of the bar! • The company Tousek Ges.m.b.H. accepts no liability for damages resulting from such a misuse! - 9 -...
  • Page 10 - 10 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 11: Cable Plan

    The Tousek Ges.m.b.H. cannot be held responsible for any consequences to be used. resulting from disregard of applying standards and laws during installation or operation of the gate facility..
  • Page 12 7. Maintenance plan for barrier PASS 838 Maintenance works may only be carried out by trained professionals. ATTENTION: Before carrying out maintenance works, turn off the power supply. According to the frequency of actuation the following works have to be carried out 1–4 times a year: • Check the correct fixing of the barrier housing.
  • Page 13 Foundation plate For barriers with flat boom: V = 190 Tip rest/support fork For barrier type PASS 838 L6 (= barrier with round boom): V = 220 Barrier system for separate entrance / exit with impulse columns V03 (1) Barriers PASS 838...
  • Page 14: Dimensioned Drawing

    + 220mm barrier width + 280mm flat - (h x w) 116mm (with rubber profile) x 30mm Boom configuration round - Ø 85mm boom length barrier width base plate measures and technical modifications subject to change ! - 14 - tousek / E_PASS-838_02 / 22. 10. 2018...
  • Page 15 Für die Zusammenstellung der technischen Unterlagen Adresse, PLZ, Ort autorizada: ist bevollmächtigt: Date/ Signature TOUSEK Ges.m.b.H., A1230 Viena, Zetschegasse 1, TOUSEK Ges.m.b.H., A1230 Wien, Zetschegasse 1, TOUSEK Ges.m.b.H., A1230 Wien, Zetschegasse 1, Austria Österreich Fecha / Firma Österreich...
  • Page 16 Buitenheide 2A/ 1 Tel. +32/ 11/ 91 61 60 Fax +32/ 11/ 96 87 05 your service partner: info@tousek.nl Tousek Sp. z o.o. Poland PL 43-190 Mikołów (k/Katowic) Gliwicka 67 Tel. +48/ 32/ 738 53 65 Fax +48/ 32/ 738 53 66 info@tousek.pl...

Table of Contents