The ALTO Ultima
Tower is certified to BS EN 1004:2004
®
3T - Through The Trapdoor Method
Assembly Guide Using 5 Rung Starter Frames
Lakeside Industries Ltd
www.altoaccess.com
sales@altoaccess.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the ALTO Ultima and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lakeside ALTO Ultima

  • Page 1 ALTO Ultima ® DOUBLE WIDTH LADDERSPAN TOWER Mobile Aluminium Access Tower Instruction Manual EN 1298-IM-EN The ALTO Ultima Tower is certified to BS EN 1004:2004 ® 3T - Through The Trapdoor Method Assembly Guide Using 5 Rung Starter Frames Lakeside Industries Ltd www.altoaccess.com...
  • Page 2 Used properly, Alto access equipment will keep you safe when working at height. This manual contains all of the information necessary to correctly assemble your ALTO Ultima mobile ®...
  • Page 3 In case of any doubt as to the integrity of any items of Alto Access equipment, the part should be withdrawn from use, quarantined and subject to detailed examination to determine whether repair or replacement is required. If returned to the factory, Lakeside Industries Limited will provide a free of charge evaluation of any damaged components.
  • Page 4 If the tower is to be used in connection with hoisting arrangements, this is outside the scope of EN1004 and requires specific advice from the manufacturer to ensure safety. · Contact the manufacturer Lakeside Industries Limited for advice on loadings Tel: +44 1527 500577 or Email: sales@altoaccess.com. ·...
  • Page 5 After completing the movement, use a spirit level to ensure that the tower is vertical and safely supported on an appropriate surface · After completing the movement check that the tower is correct and complete. ALTO Access Products | Lakeside Industries Ltd Page 5...
  • Page 6 The correct size stabilisers must always be used - see component schedule for details. 3500mm (upto 9m) 4500mm (9m & above) Tower | Assembly Guide Page 6 ALTO Ultima ®...
  • Page 7 6kn. Read the separate instruction manual before using the Alto Ultima Anchor Point. The use of the device contrary to the manual poses a threat to life.
  • Page 8 Standard scaffold tubes and fittings can be used with the Alto Access products. Ties should be spaced at no more than 4m intervals. Ties must be rigid and be secured to both frame uprights. For further details regarding tying in, please contact your supplier or the manufacturer: Lakeside Industries Limited. Tower | Assembly Guide...
  • Page 9 COMPONENT SCHEDULE 1.8m Long x 1.4m Wide (Double Width) ALTO Ultima Tower ® ALTO Access Products | Lakeside Industries Ltd Page 9...
  • Page 10 Connect the 2nd frame to the horizontal braces in the same position that they are located on the first frames. Make sure that the frame head fittings are pointing inwards into the tower. Tower | Assembly Guide Page 10 ALTO Ultima ®...
  • Page 11 Small vertical adjustments can be made to either arm to guarantee a sturdy placement. ALTO Access Products | Lakeside Industries Ltd Page 11...
  • Page 12 - running in the same parallel direction. Proceed to Step 9 Tower | Assembly Guide Page 12 ALTO Ultima ®...
  • Page 13 2 horizontal braces at the base of the tower and the 5th rung up on the tower. If a 2.9m tower is being assembled, go to step Proceed to Step 8 ALTO Access Products | Lakeside Industries Ltd Page 13...
  • Page 14 Install a 2nd platform 4 rungs above the first platform. Using the 3T method install 4 guardrails to the upper platform. If a 3.4m tower is being assembled, go to step 10. Proceed to Step 8 Tower | Assembly Guide Page 14 ALTO Ultima ®...
  • Page 15 7.2. If a 3.9m tower is being assembled, go to step 10. Proceed to Step 8 ALTO Access Products | Lakeside Industries Ltd Page 15...
  • Page 16 3T method relocate the inner guardrails to the outside face of the tower. Now install a toeboard, ensuring that the sides are hooked securely over the outside edge of both platforms. Tower | Assembly Guide Page 16 ALTO Ultima ®...
  • Page 17 Then immediately take up the protected position detailed in the 3T method. Whilst standing through the trapdoor as per the 3T method, disconnect the braces completely. ALTO Access Products | Lakeside Industries Ltd Page 17...
  • Page 18 Step 5 Now remove the final 2 frames off the top of the tower. Now repeat steps 2 to 5 until the tower is dismantled or the new platform height is achieved. Tower | Assembly Guide Page 18 ALTO Ultima ®...
  • Page 19 2041 - 2.7m Brace Ladder Frame 2056 - HD Small Stabiliser 2201 - 1.8m Trap Platform 2066 - 1.8m D/W Toeboard 2057 - HD Large Stabiliser 2043 - 1.8m Plain Platform ALTO Access Products | Lakeside Industries Ltd Page 19...