ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL SAFETY Before installing and using the PC pump, carefully read the instructions provided below. This manual contains fundamental instructions that must be followed during installation, operation and maintenance. This manual must be consulted by all qualified personnel who will follow the pumps operation and installation.
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL INSTALLATION RECOMMENDATIONS At the pumping system design stage, consideration must be given for the provision of dedicated gauges, filling or flushing connections, non-return, isolating or pressure relief valves. Due to the nature of a positive displacement pump, it is recommended a pressure relief valve is installed on the outlet side of the pump to prevent any danger and or damage in the event the flow out of the pump becomes blocked.
Pumps should be installed only in applications for which they were approved by Franklin Electric, having taken into account material compatibility, flow rates, temperature; solids handling; pressure; rotational speed and the environment. The performance capabilities of the Orbit Agricultural pump range is shown on the chart below (based on water at 20°C).
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL MOTOR WIRING ARRANGEMENT This PD pump requires a high starting torque to overcome the rotor stator friction fit. To achieve this the motor must be started direct on line (DOL) to realize maximum starting torque. Star-delta starting is not recommended.
Page 10
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL Startup check list: With the motor isolated from the pump, ensure that its rotation is the correct direction. These pumps rotate in one direction ONLY. Are there any obstructions in the pipework or pump?
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL The pump speed / pressure settings must remain below the pumps maximum limitations. Consult Franklin Electric if you are unsure. If the pump has never been run, it may be necessary to crank the pump through one revolution manually (with water/product present in the gland).
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 12. DISMANTLING Before any maintenance work is carried out on the pump, ensure that the pump is isolated from the electrical supply and that the pump's main isolating valves on the inlet and outlet are closed.
Page 15
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL Once the rotor (04) and flexshaft (33) have been withdrawn from the pump, the flexshaft must be held in wood or brass covered vice jaws and the rotor adaptor nut (30) rotated clockwise (left-hand thread) to be removed.
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 13. RE-ASSEMBLY OF PUMP Refer to Figure 1 : Exploded view : Assemble bearings (17) on mainshaft (21) with bearing spacer (16) in between, and bearing lock washer (14) on open end. Bearings (17) will need to be heated to be assembled on mainshaft (21).
Page 17
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL Insert flexshaft (33) into the hole in the rotor at opposite end to rotor adaptor nut (30) and tighten counter-clockwise (left-hand thread). Insert opposite end of flexshaft (33) through mainshaft (21). Insert flexible shaft sealing ring (31), into main shaft (21) open end.
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 14. ROUTINE MAINTENANCE To ensure optimum pump life the following components should be routinely checked: Gland Packing (refer to 14.1 GLAND PACKING). Bearings - Bearings should be cleansed and regreased every 5,000 hours.
Page 20
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL The locknut should now be loosened to give correct running clearance (see table below). The tab of the lock washer should now be bent into a corresponding slot on the locknut. Bearing Lubrication - The taper roller bearings should be packed with Castrol Spheerol EP2 grease or equivalent and the housing 1/3 filled.
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 18. INSTALLATION DATA Complete the installation data documentation for warranty purposes and for future referencing. PUMP INSTALLATION DATA SHEET...
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 19. TROUBLESHOOTING Incorrect direction of rotation Reverse the motor Pump not primed Expel gas from supply line and pumping chamber and introduce fluid. Insufficient NPSH available Increase supply line diameter. Increase suction head. Simplify supply line configuration.
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL 20. WARRANTY This document contains Franklin Electric Co., Inc. and all of its subsidiaries (collectively, "Franklin Electric") standard limited warranty, general sales policies and controlling terms and conditions for Submersible Pump (the "Goods"). This document shall not be altered or amended except as provided by Franklin Electric.
Page 27
ORBIT PP AGRICULTURAL INSTALLATION AND OPERATIONS MANUAL This limited warranty does not apply to: Any goods that have been subject to misuse (including use in a manner inconsistent with the design of the product), abuse, neglect, accident or improper installation or maintenance; and Any goods that have been altered or repaired by any person or entity other than Franklin Electric or its authorised representatives;...